Project Information

  • Document No.

  • Part No.

  • Revision No.

  • Client Name

  • Project Name

  • Inspection Started

  • Prepared by

  • Location

Test Details

  • Drawings Supplied

  • Drawing Number

  • Drawing Revision

  • Drawing Date

  • Drawing Approval RPEQ

  • Specifications Required

  • Pipeline Construction Type

  • Test Method Northern Rivers Local Government Development Construction Specification, Clause C402.43

    Initial Pressure = 35kPa
    Settle Time = 3 Minutes
    Test Pressure = 35kPa
    Hold Time = As per Clause C402.44
    Allowable Loss in Nominated Timeframe = 7kPa

  • Pipelines to be Tested

  • Pipeline
  • Pipeline Identification Details

  • Pipeline Diameter

  • Pipeline Length (m)

  • Accept the pipeline under test if the test pressure loss is =/<7kPa in 3 MINUTES

  • Consider retesting in shorter lines as this length is outside the Specifications

  • Pipeline Length (m)

  • Accept the pipeline under test if the test pressure loss is =/<7kPa in 6 MINUTES

  • Consider retesting in shorter lines as this length is outside the Specifications

  • Pipeline Length (m)

  • Accept the pipeline under test if the test pressure loss is =/<7kPa in 8 MINUTES

  • Consider retesting in shorter lines as this length is outside the Specifications

  • Pipeline Length (m)

  • Accept the pipeline under test if the test pressure loss is =/<7kPa in 11 MINUTES

  • Consider retesting in shorter lines as this length is outside the Specifications

  • Pipeline Length (m)

  • Accept the pipeline under test if the test pressure loss is =/<7kPa in 14 MINUTES

  • Consider retesting in shorter lines as this length is outside the Specifications

  • Pipeline Length (m)

  • Accept the pipeline under test if the test pressure loss is =/<7kPa in 17 MINUTES

  • Consider retesting in shorter lines as this length is outside the Specifications

  • Refer to WSA02-2002-2.3 Table 22.4 to extrapolate test hold time

  • Actual Pipeline Diameter

  • Pipeline Length (m)

  • Nominate Extrapolated Hold Time

  • RESULT

  • Pipeline Construction Type

  • Test Method Tweed Shire Council Development Construction Specification, Clause C402.43

    Initial Pressure = 35kPa
    Settle Time = 3 Minutes
    Test Pressure = 35kPa
    Hold Time = As per Clause C402.44
    Allowable Loss in Nominated Timeframe = 7kPa

  • Pipelines to be Tested

  • Pipeline
  • Pipeline Identification Details

  • Pipeline Diameter

  • Pipeline Length (m)

  • Accept the pipeline under test if the test pressure loss is =/<7kPa in 3 MINUTES

  • Consider retesting in shorter lines as this length is outside the Specifications

  • Pipeline Length (m)

  • Accept the pipeline under test if the test pressure loss is =/<7kPa in 6 MINUTES

  • Consider retesting in shorter lines as this length is outside the Specifications

  • Pipeline Length (m)

  • Accept the pipeline under test if the test pressure loss is =/<7kPa in 8 MINUTES

  • Consider retesting in shorter lines as this length is outside the Specifications

  • Pipeline Length (m)

  • Accept the pipeline under test if the test pressure loss is =/<7kPa in 11 MINUTES

  • Consider retesting in shorter lines as this length is outside the Specifications

  • Pipeline Length (m)

  • Accept the pipeline under test if the test pressure loss is =/<7kPa in 14 MINUTES

  • Consider retesting in shorter lines as this length is outside the Specifications

  • Pipeline Length (m)

  • Accept the pipeline under test if the test pressure loss is =/<7kPa in 17 MINUTES

  • Consider retesting in shorter lines as this length is outside the Specifications

  • Refer to WSA02-2002-2.3 Table 22.4 to extrapolate test hold time

  • Actual Pipeline Diameter

  • Pipeline Length (m)

  • Nominate Extrapolated Hold Time

  • RESULT

Test Procedure

Confirm Project Information

  • Pipelines to be inspected and their details

  • Testing specification requirements

Initial Work Area Inspection

  • Is test area barricaded off or sufficiently delineated?

  • Is traffic control established?

  • Has a Safe Work Method Statement been completed and all control measures followed?

  • Has a Confined Space Risk Assessment & Entry Permit been completed?

  • Is the confined space equipment and procedures set up as per the Risk Assessment & Entry Permit conditions followed?

  • Structure lids removed and placed at a safe distance from the entry point

  • Environmental controls installed as and if required

Inspection Steps

  • Equipment checked and in good working order

  • Insert test plugs into the structure inlets with extendable pole if possible

  • Inflate plugs and add support as per manufacturer's specifications

  • Attach bypass plug to compressor and pressurise pipeline to test pressure

  • Allow for pressure to stabilise for an amount of time as per specifications

  • Hold pressure for time specified in specifications and record result

Disassemble Steps

  • Disconnect hose from compressor and release pressure from pipeline

  • Release pressure from plugs and carefully retrieve plugs out of structure

  • Replace structure lids, remove barricading and return all items to test unit

Final Demobilisation

  • Notify client of results and to contact TestX office to arrange further testing or reports

  • Calibrated gauge numbers used

  • Inspector's remarks

  • Photo of work area and inspected pipeline

  • I declare that the inspection procedure was followed in accordance with the nominated specifications

  • Inspection Completed

  • Report Issue Date

Report Approval - Cam Reid

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.