Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Machine
-
Is machine running this shift?
-
Customer
-
Job Number
-
Operator
- Heath Dearing
- Jamie Wishon
- Kevin Wells
- John Martin May
- Bobby Davidson
- Edwin Torres
- Shawn Carter
- Jamie Huggins
- Jason Powles
- Jeff Scott
- Other
-
Operator name:
-
Shift
- 1st
- 2nd
- 3rd
- A
- B
- C
- D
-
Are all line clearance fields checked?
-
Describe gap.
-
Is there an operator and 2nd person signature on line clearance certification?
-
Describe gap.
-
Are all startup approval fields checked?
-
Describe gap.
-
Is there an operator and 2nd person signature on startup checks?
-
Describe gap.
-
Review special instructions.
-
Are special instructions being performed?
-
Describe Gap
-
Was a master shingle completed and documented correctly?
-
Describe gap.
-
Is one shingle present from each load?
-
Describe gap.
-
Inspect shingles for uniformity across sheet, also comparing variation on ends of sheet (left versus left and left versus right).
-
Does color of run look consistent?
-
Describe gap.
-
Inspect sheet looking for missing elements and confirming copy(ies) match proof(s).
-
Does sheet match proof?
-
Describe gap.
-
Utilize scanner to ensure passing grade of barcodes, including UPC.
-
Did all codes pass the check?
-
Describe Gap
-
Inspect sheet checking sharpness, color overlapping, edges of images and screened type. Use crosshairs to assist.
-
Was sheet free from registration defects?
-
Describe Gap
-
Review print-to-cut register by viewing sheet under die vinyl.
-
Was sheet free from registration defects?
-
Describe Gap
-
Review coating bleeds by inspecting sheet under die vinyl and utilizing black light checking for fit and smashes.
-
Was coating pattern correct?
-
Describe Gap
-
Check spot colors to ensure reading of delta 2 or below.
-
Did spot colors pass?
-
Describe Gap
-
Check built images to ensure they match to proof.
-
Did built images visually line up with proof?
-
Describe Gap
-
Using Zahn cup, measure and record viscosity of coating.
-
Was viscosity within tolerance?
-
Describe Gap
-
Did operator check and document viscosity during previous shift?
-
Describe gap.
-
Verify operator is pulling or marking starts and stops.
-
Are loads free from starts/stops or tagged?
-
Describe Gap
-
Verify samples have been marked for the order.
-
Were samples marked?
-
Describe Gap
-
Check ink usage and traceability sheet.
-
Is form up to date and filled out completely?
-
Describe gap.
-
Is make ready and run waste being properly documented on waste sheet?
-
Describe gap.
-
Were defects found either removed or tagged and logged on quality data sheet?
-
Describe gap.
-
Have all fields been filled out on the quality data sheet for each load produced?
-
Describe gap.
-
Was daily cleaning log completed for the current shift? Should be filled out even if idle.
-
Describe gap.
-
Auditor
-
Operator
-
Was daily cleaning log completed for the current shift? Should be filled out even if idle.
-
Describe gap.
-
Add signature