Information

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

1. Compliance with Conditions of Consent

  • Does the plan of management relate to the on-ground work at the Quarry? Comment:

  • Areas Of Compliance

  • Add media

  • Areas Of Non Compliance

  • Add media

  • Is the quarry operating within the footprint of the approved plan? Comment

  • Add media

2. Access Tracks

  • Are the Access tracks correctly constructed - stable, all weather access? Comment

  • Add media

  • Are adequate erosion and sediment control measures in place (for access tracks)? Comment

  • Add media

  • Are the erosion and sediment controls functioning satisfactorily? Comment

  • Add media

3. Topsoil/Overburden

  • Is topsoil / overburden being stockpiled for later rehabilitation? Comment

  • Add media

  • What is approx. quantity of material stockpiled?

  • Add media

  • Is the stockpile adequate for later rehabilitation? (< @ 1 metre in height for viable seed stock, etc.)? Comment

  • Add media

  • What are the disposal measures for the overburden? if required) Comment

  • Add media

4. Sediment and Erosion Control Measures

  • Are clean water diversion drains/swales in place and functioning satisfactorily?

  • Add media

  • is there an erosion and sed plan in place Y/N

  • Add media

  • What sediment and erosion controls in place?

  • Details of sediment and erosion controls in place.

  • Add media

  • Are they functioning adequately and installed correctly (right location, size etc.)?

  • Add media

  • Is the site and batters stable? Comment.

  • Add media

5. Rehabilitation

  • What measures are in place for rehabilitation (plan etc)?

  • What is the current area that requires rehabilitation?

  • Add media

  • Approximate cost to rehabilitate site?

  • Add media

  • Details of required rehabilitation (machine usage and actual work etc)?

  • Add media

  • Is progressive rehabilitation occurring on the site (site is to be progressively rehabilitated with max. excavated areas complying with consent conditions)?

  • Add media

6. Ongoing Extraction

  • Is the current extraction area part of the original Plan of Management?

  • Add media

  • Where is the planned extraction directed over the next 12 months?

  • Add media

  • Is the planned extraction included in the Conditions of the original Development Consent?

  • Add media

7. Reports and Contributions

  • Have all annual reports been submitted on time and in accordance with the consent?

  • Add media

  • Are there outstanding annual fees or contributions payable to Copuncil in accordance with the consent?

  • Add media

  • Any other comment?

  • Add media

8. Plans of Management

  • Has a Plan of Management been done for the pit?

  • Add media

  • Any areas of Plan of Management not complied with?

  • Add media

  • Any additions required to Plan of Management?

  • Add media

  • Have operating and rehabilitation stages been noted on plans?

  • Add media

  • Are Traffic Management Plans accurate and working?

  • Add media

9. Planned Works

  • Details of any geotech work required

  • Add media

  • Approx cost of geotech work

  • Add media

  • Details of any survey work required

  • Add media

  • Approx cost of survey work

  • Add media

  • General works required and costs

  • Add media

  • Have boundaries been clearly marked?

  • Add media

Site photo

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.