Information

  • Inspection Title. RMS Surveillance Checklist R11- Stormwater Drainage -Pipes ILC-MI-TP3-405-SC-R11- Open drains Ed 5 / Rev1

  • Project Name: Tabulam New Bridge.

  • Location: BRUXNER HIGHWAY TABULAM

  • Contractor

  • Prepared by

  • Conducted on

Work Activity Record

4.1.1 Setting Out

  • Is the set out the stormwater drainage systems as shown on the Drawings and in sufficient detail to identify:<br>(d) the locations and levels of open drains.

  • Has the Hold point point been released

  • Capture.PNG 15.PNG

4.2 CONSTRUCTION OF OPEN DRAINS

  • Are open drains excavated (including topsoil) to the dimensions shown on the Drawings.

  • Where dimensions are not shown, the open drain must have a minimum depth of 300 mm, a minimum waterway area of 0.2 m2, with side batter slopes not steeper than 2H:1V.

  • Grade the open drains to a slope of not less than 0.5% to ensure a free flow of water. Where this is not feasible, notify the Principal. Has the hold point been released

  • Capture.PNG 16.PNG
  • Has the trimmed surface of excavated open drains to a depth of 150 mm, before placing lining or spreading topsoil for vegetation or fill material in embankments of open drains been compacted to 95%

  • Where construction of an embankment is required to form an open drain, clear, grub and strip of topsoil the affected area prior to placing the fill material.<br>Place fill material complying with Clause 3.3 in layers not exceeding 200 mm in depth, and compact to 95%.

  • (b) a Plasticity Index, as determined by Test Method RMS T109, of between 15 and 30.

  • Unless otherwise shown on the Drawings or directed by the Principal, line open drains with:<br>(a) organic fibre mat and vegetation, where the longitudinal grade of the completed drain is between 1% and 5% inclusive; or

  • (b) concrete where the longitudinal grade of the completed drain is less than 1% or greater than 5%.

  • Concrete lining must have a minimum compacted thickness of 100 mm measured at right angles to the surface of the lining,

  • Have rock mattresses been used only where shown on the Drawings.

  • Have movement joints been placed in concrete lining at intervals of not more than 3.0 m along the open drain to control cracking.

  • Install expansion joint material complying with RMS 3204 to the full depth of the concrete lining at every fifth movement joint.

  • Does the open drain conform to construction tolerances in table R11.4

  • Capture.PNG 18.PNG

G22 Safety and G36 Environmental

G22 SAFETY

  • Has a safe work and technical criteria been implemented for the connection of existing pipes to new pipes that have the same or grater size.

  • Have operators demonstrated their competence to operate the plant/equipment to the satisfaction of the contractor. <br>

  • Has a SWMS been developed.

  • Is each and every item of plant being used for its designated and intended purposes.

  • Have the attachments for plant and processes been approved and used in accordance with their design and purposes.

  • Is the correct PPE being worn

  • Is the laser used approved for use.

  • Is all lifting plant fitted with approved hooks/lugs and its SWL marked.

  • Has safe entry/ exit been provided to excavations.

  • Has the excavation been battered/benched if depths greater than 1.5m, or if there is a possibility of collapse.

  • Has spoil been placed away from the excavation.

  • Were any unsafe practices observed. <br>

  • Good safe practices observed.

G36 ENVIRONMENTAL

  • R44 Cl 1.7 Were erosion and sediment controls in place prior to the removal of any topsoil.

  • Are Erosion and Sediment controls measures being installed prior to works commencing and are they being maintained.

  • Has mud been prevented from being deposited on roadways.

  • Have any environmental incidents or potential incidents been observed.

  • Good environmental procedures observed.

Compliance and Follow-up action.

  • Is the activity compliant.

  • Surveillance Officer

  • NCPN or memo number.

  • Follow up action

  • Product Non Conformance

  • System Non Conformance

  • Contractor generated NCR

  • Contractor generated a CAR

Matters arising

  • NCPN no

  • Contractors NCR no

  • CAR no

  • Closed out.

  • RMS representative's name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.