Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Perimeter / Compound Signage In Place
-
Traffic Management In Place And Being Adhered To
-
Subcontractors Wearing Hard Hats Where Required
-
Subcontractors Slewing Loads Have High Risk Work Licences
-
Loads Not Carried Over Machine Cabs
-
Excavations Greater Than 1.5 Metres Are Shored
-
Excavated Material Is Not Near The Edge Of The Excavation
-
Work Around Power Lines Is Outside Of The Danger Zone
-
Site Fencing (Where Installed) Secure And In Place
-
Wind / Dust Fencing In Place
-
Windrows In Place As Barricading / Delineation
-
Dust Suppressed / Watered Down
-
Unworried Areas Protected From Wind (Hydromulched)
-
All Site Personnel Wearing Correct PPE
-
Daily Machine Pre Starts Completed (Random Sample)
-
Flashing Lights On All Site Vehicles And Plant
-
Hydrocarbons Are All Stored On Bunds
-
Bins Available And In Use
-
JSEA's In Use Are Signed Onto By Workers (RJV and Subcontractors)
-
Workers On Site Are Inducted
-
Workers Signed Onto Daily Pre Shift A In Inducted
-
Subcontractors are Following There JSEA's (Sample)
-
RJV Operators Are Following SWMS (Sample)