Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Perimeter / Compound Signage In Place

  • Traffic Management In Place And Being Adhered To

  • Subcontractors Wearing Hard Hats Where Required

  • Subcontractors Slewing Loads Have High Risk Work Licences

  • Loads Not Carried Over Machine Cabs

  • Excavations Greater Than 1.5 Metres Are Shored

  • Excavated Material Is Not Near The Edge Of The Excavation

  • Work Around Power Lines Is Outside Of The Danger Zone

  • Site Fencing (Where Installed) Secure And In Place

  • Wind / Dust Fencing In Place

  • Windrows In Place As Barricading / Delineation

  • Dust Suppressed / Watered Down

  • Unworried Areas Protected From Wind (Hydromulched)

  • All Site Personnel Wearing Correct PPE

  • Daily Machine Pre Starts Completed (Random Sample)

  • Flashing Lights On All Site Vehicles And Plant

  • Hydrocarbons Are All Stored On Bunds

  • Bins Available And In Use

  • JSEA's In Use Are Signed Onto By Workers (RJV and Subcontractors)

  • Workers On Site Are Inducted

  • Workers Signed Onto Daily Pre Shift A In Inducted

  • Subcontractors are Following There JSEA's (Sample)

  • RJV Operators Are Following SWMS (Sample)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.