Information
-
Tech Name
-
Audit Month
-
System
-
Conducted on
-
Prepared by
-
Location of QC
-
Work Order Type/Account #
Power Supply
-
Power Supply blown out -10
-
Power Supply events cleared -10
-
Power supply clean of debris -10
-
Power supply switched to stand-by correctly -10
-
Inverters test good and in all power supplies -10
-
Database updated with correct info and if any discrepancies they are on comments -10
Power Supply Exterior
-
Area around power supply cleaned up (ex. weeds, trash) -10
-
Power supply locked and secured -10
-
If damaged, comments stating repairs -10
-
If graffiti is found, cleaned up or comments -10
-
Peds next to power supplies locked and secured -10
-
Breaker box locked and secured -10
Work Start or SRO
-
Peds locked and secured -10
-
Area around peds cleaned and repaired or turned in -10
-
Levels passing home cert EOL @ tap for work starts -10
-
Dust caps secured and not missing -10
-
Temps turned over for replacement -10
-
All tap ports terminated -10
-
Tap organized in aesthetically pleasing manner -10
-
Lashing wire secured -10
-
CLI leaks fixed or marked by yellow tag -10
-
Safety gear worn when work is in progress -10
-
Cones properly used when out of truck
-
Actives secured and locked up -10
-
All drops secured and tightened -10
-
Broken peds turned over for replacement -10
-
No loose fittings or housings -10
-
All screws secured on passive and active devices -10
Fiber Repair or Install
-
Enclosure sealed and secured to ped and strand -10
-
Fiber is grounded and secured in trays -10
-
Storage is secure and lashed up or taped every few feet (temp) -10
-
All debris is picked up and area cleaned up -10
-
Enclosure is marked or turned over to be marked -10
-
Data has been sent to AFO for update (id, ,mileage, GPS coordinates) -10
-
RFOG and GPON fiber slicing secure and set up correctly -10
-
Additional Comments
Report Card Score: 100 = 5; 99-90 = 4; 89-80 = 3; 79-70 = 2; 69 or less =1
-
Total Score (100 points possible; 70 or less points Fail):
-
Tech Signature
-
Supervisor Signature
-
Manager Signature