Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
WATERPROOFING CHECKLIST
-
Bath hob is completed and check back edge of bath
-
Shower recess in complete
-
Outer shower areas complete for walk-in shower
-
Skirting complete to all wet areas
-
All pipe penetrations complete
-
Waterproofing behind cabinetry completed
-
Check mixers, taps and shower rails penetrations are sealed
-
Check water stop angles are 5mm above base tiles
-
Check door angles are fitted
-
Take photos of bathroom
-
Takes photos of ensuite
-
Take photos of WC and powder
-
Take photos of Laundry
OTHER ITEMS
-
Document any other areas of concern using notes/photos as appropriate
COMPLETION SIGNATURE
-
Supervisor Signature
-
Date completed