Title Page
-
Contract Name and Numbers
-
Description of Works
-
Subcontractor
-
Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)
-
Construction Drawing Ref
-
Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)
-
Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)
Untitled Page
1st Fix Installation
-
Surface handover: - Flatness of surface - Singular points conform to detailing (Checked y Sub-Contractor)
-
Surface handover: - Flatness of surface - Singular points conform to detailing (Checked by Ventry)
-
Care of adjacent surfaces (Checked by Sub-Contractor)
-
Care of adjacent surfaces (Checked by Ventry)
-
Surface preparation (Checked by Sub-Contractor)
-
Surface preparation (Checked by Ventry)
-
Install all droppers, parapet outlets, scuppers, sumps, overflows etc. in substrate recessed (Checked by Sub-Contractor)
-
Install all droppers, parapet outlets, scuppers, sumps, overflows etc. in substrate recessed (Checked by Ventry)
-
Install all under-flashings to upstands, and internal and external corners (Checked by Sub-Contractor)
-
Install all under-flashings to upstands, and internal and external corners (Checked by Ventry)
-
Installation of waterproofing: - Installation temperature as specified - Overlapping requirements complied with - Crossing requirements complied with - Return height requirements complied with - Singular points conform to detailing (Checked by Sub-Contractor)
-
Installation of waterproofing: - Installation temperature as specified - Overlapping requirements complied with - Crossing requirements complied with - Return height requirements complied with - Singular points conform to detailing (Checked by Ventry)
-
Check overall for workmanship (Checked by Sub-Contractor)
-
Check overall for workmanship (Checked by Ventry)
-
Water or electrical testing (Checked by Sub-Contractor)
-
Water or electrical testing (Checked by Ventry)
Hold Point Inspection
-
Items above to be checked before work continues with photographic evidence recorded
Finishes
-
Roof finishes as per specification (Checked by Sub-Contractor)
-
Roof finishes as per specification (Checked by Ventry)
Comments
-
Any Comments
Final Inspection - All Items Completed and Inspection Passed
-
Inspected By:
-
Inspected By:
-
Inspected By: