Title Page

  • Contract Name and Numbers

  • Description of Works

  • Subcontractor

  • Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)

  • Construction Drawing Ref

  • Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)

  • Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)

Untitled Page

1st Fix Installation

  • Surface handover: - Flatness of surface - Singular points conform to detailing (Checked y Sub-Contractor)

  • Surface handover: - Flatness of surface - Singular points conform to detailing (Checked by Ventry)

  • Care of adjacent surfaces (Checked by Sub-Contractor)

  • Care of adjacent surfaces (Checked by Ventry)

  • Surface preparation (Checked by Sub-Contractor)

  • Surface preparation (Checked by Ventry)

  • Install all droppers, parapet outlets, scuppers, sumps, overflows etc. in substrate recessed (Checked by Sub-Contractor)

  • Install all droppers, parapet outlets, scuppers, sumps, overflows etc. in substrate recessed (Checked by Ventry)

  • Install all under-flashings to upstands, and internal and external corners (Checked by Sub-Contractor)

  • Install all under-flashings to upstands, and internal and external corners (Checked by Ventry)

  • Installation of waterproofing: - Installation temperature as specified - Overlapping requirements complied with - Crossing requirements complied with - Return height requirements complied with - Singular points conform to detailing (Checked by Sub-Contractor)

  • Installation of waterproofing: - Installation temperature as specified - Overlapping requirements complied with - Crossing requirements complied with - Return height requirements complied with - Singular points conform to detailing (Checked by Ventry)

  • Check overall for workmanship (Checked by Sub-Contractor)

  • Check overall for workmanship (Checked by Ventry)

  • Water or electrical testing (Checked by Sub-Contractor)

  • Water or electrical testing (Checked by Ventry)

Hold Point Inspection

  • Items above to be checked before work continues with photographic evidence recorded

Finishes

  • Roof finishes as per specification (Checked by Sub-Contractor)

  • Roof finishes as per specification (Checked by Ventry)

Comments

  • Any Comments

Final Inspection - All Items Completed and Inspection Passed

  • Inspected By:

  • Inspected By:

  • Inspected By:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.