Information
Weekly SITE SAFETY INSPECTION - MARKSCON
-
Document No.
-
Site Name / Location:
- 1-3 Moffat St, Brighton
- 965 Doncaster Rd, Doncaster
- 15 Bent Street Bentleigh
- Subway Monash Uni
- 19 Hinkler Road Mordialloc
-
Conducted on
-
Conducted By:
- Richard Ingram
- Bradley Marks
- John Marks
- Sam Marks
- Adam Stewart
-
Site Manager
-
If OTHER please specify
Standard Inspection Routine
ADMINISTRATION
-
Is there adequate Safety Signage at entrances to Site?
-
Is there a clean and clear path from Site Entrance to Site Office?
-
Is the Site Numbers Board being utilised and up to date?
-
Have all trades and contractors been inducted?
-
Are Site Safety signs displayed in Site Office?
- WorkSafe QBE Notice
- Project / Contact Details
- Site Plan
- Evacuation Plan
- Evacuation Procedure
- Health & Safety Rules
-
Are WORKSAFE or MARKSCON Guidance Notices or Posters on Display?<br>
-
Has site specific hazards been clearly outlined on arrival or after sign in / induction?
-
Is all temp fence in position and secure?
-
Is First Aid Kit Present and well stocked? If no, please create followup and list your requirements for restocking
-
Is First Aid Incident Register present?
-
Are all current SWMS's on site Signed and in place?
HOUSEKEEPING
-
Is Personal Protective Equipment and clothing being worn where required?
-
Is site clean internally?
-
Is site clean externally?
-
Is Site Cage (rubbish) at a safe capacity?
-
Is toilet clean and fully stocked with toilet paper?
-
Is there clear access to all work areas onsite?
-
Is the site lunchroom is good, clean order?
PERSONAL PROTECTIVE EQUIPEMENT
-
Is appropriate PPE being worn by staff and contractors on site?
-
Is there adequate and accessible PPE for visitors to the site?
TRAFFIC MANAGEMENT
-
Is appropriate Traffic Management in place and being used well? This includes pedestrian traffic.
FALLS PROTECTION
-
Are fall protection systems installed for works at 2.0 meter heights and over?
-
Are fall protection systems in place and used?<br>E.G. Kick boards, Shadecloth, Hoardings.
-
Are barricades or fencing in place on high structures or platforms?
-
If ladders are in use, are they fastened correctly to prevent falls?<br>Are they Industrial Grade?
-
If scaffold is in use on site, is it in good working order?<br>Is it in Date?
ELECTRICAL EQUIPMENT
-
Are all electrical leads and equipment onsite tested and hold a current tagged?
-
Are leads organised well, not creating trip hazards, not running through water, or placed on metal/steel structures?
-
Is there clear access to the meter box or power pole?
-
Has the meter box been tested and currently tagged?
-
Are power supply boxes in good order?<br>(Are cords running out correctly?)
-
If over head power lines are present, is works kept out of the No Go or Danger Zones?
HAZARDOUS MATERIALS
-
Are hazardous materials on site?
-
If so, what are they?
-
If so, are Material Safety Data Sheets (MSDS) available?
PLANT AND EQUIPMENT
-
Are excavators used as cranes fitted with velocity valves and Safe Work Limits (SWL) stamped on boom?
-
Are roll over protection systems on all earth moving equipment?
-
Where applicable, are reverse and visual alarms operation and audible?
-
Are Elevated Work Platforms used on a firm level surface?
-
Are the operators of the Plant or Equipment holders of appropriate Tickets or Qualifications?
EXCAVATION & TRENCHING
-
Are excavations regularly inspected for erosion or collapse?
-
Has safe access / egress been provided for deep excavations?
-
Has spoil material and equipment been stored away from excavation edges?
-
Is trenching or excavation in a shaft deeper than 1.5 meters?<br>SWMS for Confined Space is Required
POINTS of INTEREST (including follow ups)
-
ADD POINTS of INTEREST identified here along with their description(s), photos as well as ANY action taken or proposed to be taken, and those who are name responsible to ensure the agreed appropriate action be taken.
-
POINTS of INTEREST
POINT:
-
Description:
-
Photograph(s)
-
NOTES:
Sign Off
-
Person completing Site Report:
Level By Level Assessment
Level By Level Assessment
-
Standard Inspection for each level / area of the construction site.
-
Level Inspection
Point:
-
Level of Construction Site
- BASEMENT
- GROUND FLOOR
- 1ST FLOOR
- 2ND FLOOR
- 3RD FLOOR
- 4TH FLOOR
- ROOF
- ENTRANCE/GARDEN AREAS
- DRIVEWAY/ENTRANCE WAY
- REAR GARDEN/COURTYARD AREA
-
Area being inspected
- Unit/Apartment 1
- Unit/Apartment 2
- Unit/Apartment 3
- Unit/Apartment 4
- Unit/Apartment 5
- Unit/Apartment 6
- Unit/Apartment 7
- Unit/Apartment 8
- Unit/Apartment 9
- Unit/Apartment 10
- Unit/Apartment 11
- Unit/Apartment 12
- Unit/Apartment 13
- Unit/Apartment 14
- Unit/Apartment 15
- Unit/Apartment 16
- Unit/Apartment 17
- Unit/Apartment 18
- Unit/Apartment 19
- Unit/Apartment 20
-
Are contractors currently working in this area?<br>If so what works are being conducted?
-
Is the area clean from rubbish and debris?
-
Is the area clear of trip and / or falls hazards?
-
Is there adequate lighting provided in this area?
-
Is there adequate ventilation in this area?
-
Where required, is there appropriate Fire Safety Equipment in this area?
-
Does the work area have sufficient protection from increment weather?<br>Include, high temperatures as well cold, wet weather.