Information

  • Inspection Title: H2A USE, INSTALLATION, INSPECTION AND/OR REPAIR OF PLANT AND EQUIPMENT .

  • Project Name: Tabulam New Bridge.

  • Location: BRUXNER HIGHWAY TABULAM

  • Contractor

  • Prepared by

  • Conducted on

Work Activity Record

  • References:
    WHS Regs. Chapter 5, Part 5.1, 5.2, 5.3 – s186-s288
    G22 – In complete and Annexure G22/J – Truck & Plant Requirements
    There are numerous Codes of Practice that relate to Plant & Equipment – WorkSafe NSW has the documents available on their website:
    http://www.safework.nsw.gov.au/law-and-policy/legislation-and-codes/codes-of-practice
    Additionally there are numerous Australian Standards that should be reviewed for information and specification requirements for specialised plant and equipment. Discuss with WHS Partner.

  • N.A. Not Applicable N.C. Not Checked

1 Have foreseeable hazards from the operation of plant/equipment been assessed, including the following:

  • <br> Contact or entanglement with the machinery or materials?<br>

  • Being trapped between the machine and any material or fixed structures?

  •  Being struck by ejected material from the machinery?

  •  Noise and vibration from the machinery?

  •  Release of potential energy?

  • 2<br>Have the design limitations of the machine been assessed, with regard to the intended use of the machine?

  • 3<br>Has any history of unsafe incidents or adverse health effects involving the plant/equipment been investigated and control responses applied?

  • 4<br>Have the consequences of reasonably foreseeable misuse or malfunction been assessed?

  • 5<br>Has a schedule of inspection, maintenance, repair and cleaning been developed for all plant/equipment?<br>

  • 6<br>Are records kept of inspection

  • 7<br>Were risk assessments carried out on any modification to plant/equipment and the results of the risk assessment taken into account in the final modification?

8 Have all operators of plant/equipment:

  • <br> Received the appropriate training,<br>

  •  Hold certificates of operation where required,

  •  Demonstrated their competence to operate the plant/equipment to the satisfaction of the contractor?

  • 9<br>Are records kept to show that all operators have received appropriate training and instruction?

Compliance and Follow-up action.

  • Is the activity compliant.

  • Surveillance Officer

  • NCPN or memo number.

  • Follow up action

  • Product Non Conformance

  • System Non Conformance

  • Contractor generated NCR

  • Contractor generated a CAR

Matters arising

  • NCPN no

  • Contractors NCR no

  • CAR no

  • Closed out.

  • RMS representative's name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.