INSPECTION
PCL number(s)
FAR number(s)
Target LEVEL OF SERVICE for this facility (3 Star if unspecified)
General Comments
Are there are any issues on assets that are not directly managed by BFM such as: Trees, Paths, Roads and Parking areas, Bollards, Play equipment, Barriers, Fences & Signage, Light posts and Power boxes, etc. ?
Item for consideration by the Service Provider
Enter exact location, details and works required
Is there a BFM managed asset on this site ?
Main Purpose of structure e.g. Picnic shelter etc.
Is there a defect ?
Enter exact location, defect details and works required
- IMMEDIATE/URGENT (WHS issue) - Phone through to BFM from site
- Very High - Within 1 week
- High - Within 1 month
- Routine - Within 6 months
- Programme (12 months plus)
- CAPEX WORKS (>$10k)
- <$500
- $500 - $1000
- $1000 - $2000
- $2000 - $3000
- $3000 - $5000
- $5000 - $7000
- $7000 - $10,000
- $10,000 - $15,000
- >$15,000
- NIL ALLOCATED
Is there a need to paint the facility within the next 3 years ?
Is there evidence of pest activity i.e. Termites, rodents etc.?
Is there any timber on site that would require periodic inspection / or pest treatment?
General comments pest
Are there any CCTV cameras attached to the facility ?
Are there any electrical services I.e. Power points, lights ?
Are there any taps, showers or water services ?
Is there any fire equipment at the facility or site ?
General comments
- VERY GOOD
- GOOD
- AVERAGE
- POOR
- FAILED/REDUNDANT
- not applicable
- VERY GOOD
- GOOD
- AVERAGE
- POOR
- FAILED/REDUNDANT
- not applicable
- VERY GOOD
- GOOD
- AVERAGE
- POOR
- FAILED/REDUNDANT
- not applicable
Condition. Score
Very good. >30
Good. 25-30
Average 20-25
Poor <20
Provide actual score obtained here ...
- 5 STAR (Highest)
- 4 STAR
- 3 STAR
- 2 STAR
- 1 STAR (Lowest)
Are there any bbq's on the site ?
INDICATIVE Cost of undertaking all identified works, including any quotations required (Note that this estimate excludes the costs of any works that might arise as a result of any specialist quotations if identified in the report)