safetyculture-logo
Log in Get started for FREE
Back to home

Search

Login to iAuditor
Get started for FREE
Home
Local Government
Condition & Defect Insp. - Tenure Provision, Renewal or Termination
Condition & Defect Insp. - Tenure Provision, Renewal or Termination
ian pearl

Condition & Defect Insp. - Tenure Provision, Renewal or Termination Checklist

Building Maintenance - IS - BFM

Use this Digital Checklist
Download as PDF
graphic of a hand making an okay sign ×

Free Condition & Defect Insp. - Tenure Provision, Renewal or Termination Checklist

Use this Digital Checklist

Template Preview

app-store-download play-store-download

GO DIGITAL TODAY
Convert your paper checklists into digital forms

Scan this QR code to use this paper checklist on your smartphone or tablet. Visit www.iauditor.com

Scannable QR Code to download App

INSPECTION

DETAILS
1. BUILDINGS
Provide a representative photo(s)
Building Type ( for insurance ) A-D A - Reinforced concrete walls, floor, frame, roof [eg bomb shelter!] B - Non-combustible walls, floor, frame, roof (Excluding reinforced concrete as in Type A) [eg tin shed with steel purlins] C - Non-combustible walls and roof but with timber frame and floors [eg tin shed with timber frame] D - Combustible frame, walls, roof [eg old Queenslander]
  • A - Concrete Reinforced
  • B - All steel
  • C - Steel and Timber
  • D - All timber
Approx year of construction
What is the appropriate design life that should be applied to this facility when constructed? (30 years minimum to 60 years maximum)
  • 30 years (Most structures will fall into this category)
  • 40 years
  • 50 years
  • 60 years

Approx. Roof area (measure or extract data taken from an aerial photo )

2. a. DEFECTS on this BUILDING FACILITY - EXTERNAL

..... Are there any identified defects on: Walls, roof coverings, rainwater goods, flues/vents/skylights, paintwork and decorative finishes, distortion of roof framing, access paths, driveways or perimeter fencing ?

Enter defect (enter each defect separately)

XXXXXXXXXX. EXTERNAL DEFECT No.

Location and photos of defect

Enter exact location of the defect on the structure e.g. North East corner post etc.

or use this to draw outline of asset and where the defect is located on the asset
Photo (s) of actual defect (close up)

Enter defect details and works req.

Works priority
  • High (Within 1 month)
  • Medium (Within 3 months)
  • Low (Within 12 months)
  • VERY HIGH (Contact BFM to discuss response required)

Confirmation - The issue warrants immediate action ? Yes or No (if 'Yes', an email notification will be sent but you MUST phone the issue through to the BFM Admin officer or your Supervisor)

***** ENSURE YOU SYNC THIS DEVICE ASAP TO ENABLE NOTIFICATION TO OCCUR QUICKLY *****

PROPERTY TEAM : COMMENTS/ UPDATE / COMPLIANCE INSPECTION
Photo of issue/ site

Property Team Comments ...

2. b. DEFECTS on this BUILDING FACILITY - INTERNAL

..... Are there any identified defects on internal components e.g.: Ceilings, walls, floors, fixtures and fittings or finishes ?

Enter defect (enter each defect separately)

XXXXXXXXXX. INTERNAL DEFECT No.

Location and photos of defect

Enter exact location of the defect on the structure e.g. North East corner post etc.

or use this to draw outline of asset and where the defect is located on the asset
Photo (s) of actual defect (close up)

Enter defect details and works req.

Works priority

Confirmation - The issue warrants immediate action ? Yes or No (if 'Yes', an email notification will be sent but you MUST phone the issue through to the BFM Admin officer or your Supervisor)

***** ENSURE YOU SYNC THIS DEVICE ASAP TO ENABLE NOTIFICATION TO OCCUR QUICKLY *****

PROPERTY TEAM : COMMENTS/ UPDATE / COMPLIANCE INSPECTION
Photo of issue/ site

Property Team Comments ...

3. SCHEDULE BUILDER - For the production of proactive maintenance routines (Frequency depends on Star rating of the Facility)
(3.1.) EXTERNAL - General

a) Approx. length of fencing associated with the property (m) if not shared with other buildings

b) Approx. area of footpaths, driveways and parking areas if not shared with other buildings (m2)

c) Approx. area of landscaping to maintain. if a shared site, just include perimeter area around the building (m2)

d) Number Of boom gates or auto. roller doors

e) Are there any CCTV cameras ?

f) Is there a fire hydrant within the ground of the facility ?

g) Is there a fire booster pump ?

h) Number Of emergency exits that need to be kept clear of vegetation

i) Is there a non- return RPZ valve evident on the water intake to the building or on irrigation line?

j) Is there a safety shower? NOTE: Also check if it is in date - yearly inspections required

(3.2) ROOF, GUTTERS, DOWNPIPES & FASCIA'S

a) Is roof sheet cleaning or gutter cleaning required periodically?

Are there gutters and downpipes?

b) Combined Approx length of guttering and downpipes (m)

ENERGY CONSERVATION MEASURES - Are there solar panels on the building?

c) Identify the number of P.V. panels ( note these will req. periodic cleaning)

(3.3) Toilets, Showers and Kitchens

a) Are there showers, basins or sinks present ( req. to identify tap washer changes in high profile sites) ?

b) Number of exhaust or extract fans
c) Number of water coolers that are plumbed in
d) Number of ice making machines

e) Is there a LARGE commercial fridge?

f) Is there a Hot Water supply to this facility ?

g) Is there a gas supply to this facility ?

h) Is this facility on a septic system or any system not connected to mains sewer ?

I) Are there water circulation pumps (that are large and req. regular overhaul) and or sewerage pumps or macerators?

Provide description...

(3.5) Services
i) Climate Control

a) ENERGY CONSERVATION MEASURES: Provide details of the number of box ac's and location

Identify the number of :

b) Split systems
c) Package systems
d) Air handling units

e) Is there a central chiller plant?

f) Cooling towers

g) Is there a BMS system?

ii) Electrical
a) Number of distribution boards

b) Total No. of push button type RCDS in all Distribution boards

c) Is 'thermoscan' required for this DB ? (Generally if there is more than 1 dist. board, or there are large loads)

Provide justification here ...

d) Is there a security system with battery backup ?

Provide details here and make note of BATTERY DATE

e) Is there a Standby Generator Set?

f) Is there a UPS system present ?

g) Are there a number of lights not working that would indicate that a bulk lamp change is needed?

Provide details for a bulk lamp change

h) Is there a lightning conductor or cathodic protection system in the facility ?

iii) Mechanical
a) Number of lifts (cars)
b) Number of auto pedestrian doors
c) No. Of external or security doors with self-closing mechanisms
(3.6) Fixtures,fittings and finishes
a) How many rooms are there that contain cabinet units e.g. the kitchen, bathroom etc. that would require replacement every 15-20 years or so ?

b) What is the approximate area (m2) of floor covering in the entire facility such as vinyl, carpets etc. that would require periodic replacement ?

c) What is the approximate area (m2) of external wall surface that would need to be periodically repainted ?

d) What is the approximate area (m2) of INTERNAL wall surface that would need to be repainted periodically ?

(3.7) PEST Control

Check to see if pest control is up to date by looking for stickers on site

a) Are there timber components on site that would require periodic inspection for termite treatment?

What was the last test date ?

b) Does the facility need periodic cockroach/rodent pest treatment? Hint: State 'YES' if generally inhabited

Explain why treatment is not needed ...

Comments or ref. To other documents

(3.8) WHOLE FACILITY - Fire / emergency appliances (Remember to include any outside)

Indicate the number of :

a) Extinguishers
b) Fire hose reels
c) Fire blankets
d) Heat or smoke detectors
e) Illuminated exit signs
f) Fire doors

g) Is there a FIP in this room?

h) Is there an EWIS panel?

i) Is there a fire sprinkler system?

(3.9) GREASE TRAP

Is there a grease trap on the Facility?

4. GENERAL COMMENTS ON THIS FACILITY

General comments or inclusions to annual operating costs :

5. GENERAL CONDITION OF THIS FACILITY
(5.1.) GENERAL CONDITION RATING - Exterior Elements (If more than 1 structure, consider a representative score for the whole site)
Condition rating - Exterior finishes / painting
  • 1) VERY GOOD
  • 2) GOOD
  • 3) AVERAGE
  • 4) POOR
  • 5) FAILED/REDUNDANT
  • not applicable
Condition rating - Structural elements, Roof sheeting, Roof drainage, Walls and Floors
  • 1) VERY GOOD
  • 2) GOOD
  • 3) AVERAGE
  • 4) POOR
  • 5) FAILED/REDUNDANT
  • not applicable
(5.2.) GENERAL CONDITION RATING - Interior Elements
Condition rating - Interior fixtures, fittings, finishes and general paint condition
  • 1) VERY GOOD
  • 2) GOOD
  • 3) AVERAGE
  • 4) POOR
  • 5) FAILED/REDUNDANT
  • not applicable
Condition rating - Toilets, showers & kitchens.
  • 1) VERY GOOD
  • 2) GOOD
  • 3) AVERAGE
  • 4) POOR
  • 5) FAILED/REDUNDANT
  • not applicable
Condition rating - Services
  • 1) VERY GOOD
  • 2) GOOD
  • 3) AVERAGE
  • 4) POOR
  • 5) FAILED/REDUNDANT
  • not applicable
Condition rating - Major plant
  • 1) VERY GOOD
  • 2) GOOD
  • 3) AVERAGE
  • 4) POOR
  • 5) FAILED/REDUNDANT
  • not applicable
(5.3.) OVERALL CONDITION SCORE for whole facility
Suggested CONDITION based on the findings of this report
  • 1) Very Good - almost like new
  • 2) Good - Above the minimum standard
  • 3) Average - Meets the standard required for the LOS of this facility
  • 4) Poor - Below the standard required
  • 5) Very Poor - Well below the standard required
Estimated useful life based on current usage and condition..
  • 20+ YEARS
  • 10 - 20 YEARS
  • 5 - 10 YEARS
  • Less than 5 years
6. RECOMMENDATIONS or OBSERVATIONS

..... Are there any recommendations e.g need to review at next inspection etc. or OBSERVATIONS where they may be defects on assets not maintained by BFM ?

Enter each separately

Recommendation or Observation #
Photo of the issue

Enter exact location to enable staff to find easily

Enter details and any recommendations

7. General comments on any issues NOT already covered

8. ASSET MANAGEMENT TEAM

Estimated total cost estimate for repairs should they be undertaken by CRC ( at the request of the property team)
8.1 ASSET MANAGEMENT TEAM - Estimated total cost estimate for DEFECT repairs should they be undertaken by CRC.

Approx. total cost to repair defects ... $

Condition & Defect Insp. - Tenure Provision, Renewal or Termination
ian pearl

Condition & Defect Insp. - Tenure Provision, Renewal or Termination

Building Maintenance - IS - BFM

Use this Digital Checklist
Download as PDF
Please note that this checklist is a hypothetical example and provides basic information only. It is not intended to take the place of, among other things, workplace, health and safety advice; medical advice, diagnosis, or treatment; or other applicable laws. You should also seek your own professional advice to determine if the use of such checklist is permissible in your workplace or jurisdiction.

Related checklists

CBFM - Building Condition, Defect and Component Insp.
ian pearl
CBFM - Building Condition, ...
Creation of Works Progs. & Cyclic Building Maintenance Regimes
16 downloads
BFM - Building Condition, Defect and Component Insp.
ian pearl
BFM - Building Condition, D...
Creation of Works Progs. & Cyclic Building Maintenance Regimes
21 downloads
BFM - Building Maintenance - Schedule Builder
ian pearl
BFM - Building Maintenance ...
Creation of Cyclic Building Maintenance Regimes
29 downloads
BFM - Building & Structures Inspection - Parks and Open Spaces.
ian pearl
BFM - Building & Structures...
Creation of Works Progs. & Cyclic Building Maintenance Regimes
12 downloads
IRC - Draft Building Condition, Defect and Component Insp.
Anonymous
IRC - Draft Building Condit...
Creation of Works Progs. & Cyclic Building Maintenance Regimes
5 downloads
BFM - AFTER HOURS CALLOUT REPORT Copy
ian pearl
BFM - AFTER HOURS CALLOUT R...
Call out report form for use by BFM staff
8 downloads
PROPERTY SERVICES - Lease condition assessment
ian pearl
PROPERTY SERVICES - Lease c...
Lease Compliance Document
19 downloads
BFM Site Safety Inspection Report
ian pearl
BFM Site Safety Inspection ...
Audit of workplace conditions & Site Safety
23 downloads
back arrow for carousel
back arrow for carousel

Don’t start from scratch each day

Use iAuditor to create and update checklists in minutes, deploying to your whole workforce from one application.

Find out how
  • Product
    • Product

    • iAuditor
    • Temperature logging
    • TeamTrain
    • Spotlight
  • Resources
    • Resources

    • Templates
    • Checklists
    • Topics
    • Blog
    • Events & Webinars
    • Apps
    • API
  • Support
    • Support

    • Support center
    • Product updates
    • Book a demo
    • Integrations
  • Company
    • Company

    • About us
    • Careers
    • Meet the team
    • Contact us
Status Privacy & Terms Security
iAuditor Logo Icon ©SafetyCulture 2021