Title Page
-
Conducted on
-
Location
-
SAM ID
-
ADDRESS
-
BSA AUDITOR
-
ASSIGNED CONTRACTORE
-
TECHNICIAN
-
JOB TYPE
-
Conduit entry into pit to standard.<br>
-
Correct size riser pipe installed on pole.<br>
-
Riser pipe neatly & securely attached to pole.<br>
-
Aerial cable correctly attached to pole. I.e. screw hook / bandit tie.<br>
-
Minimum ground clearance maintained.<br>
-
Nylon insulator fitted at building terminations.<br>
-
Correct cable type and size used.<br>
-
Correct separation from other services. (e.g. Metal objects - Power/Optus).<br>
-
New 20mm lead-in conduit installed to standard; not exposed to termites and does not allow water to drain externally to house.<br>
-
Lead-in conduit neatly & securely attached to building.<br>
-
200mm drip loop provided prior to entry into aerial fed PCD; No drip point for cable at customer premises.<br>
-
Lead-in conduit type and size to standard.<br>
-
Conduit at correct depth.<br>
-
Thread moisture seal installed (rubber grommet).<br>
-
RG6 /RG11 heat shrink present at tap port as per standard.<br>
-
PCD SITUATIONAL PHOTO
-
PCD INSTALLED
-
PCD cover secured correctly.<br>
-
Cable entry at correct orientation i.e. cable enters from below into PCD.<br>
-
Rubber boot correctly fitted in PCD.<br>
-
Isolator Installed.<br>
-
Isolator installed to standard.<br>
-
Splitter installed to standard.<br>
-
Amplifier installed to standard.<br>
-
Correct connector installed in PCD box.<br>
-
Connector fitted correctly.<br>
-
PCD Box correctly mounted
AUDIT OUTCOME
-
Site left safe.<br>
-
OUTCOME
-
ALL INFORMATION PROVIDED IS CORRECT