Title Page

  • Conducted on

  • Location
  • SAM ID

  • ADDRESS

  • BSA AUDITOR

  • ASSIGNED CONTRACTORE

  • TECHNICIAN

  • JOB TYPE

  • Conduit entry into pit to standard.<br>

  • Correct size riser pipe installed on pole.<br>

  • Riser pipe neatly & securely attached to pole.<br>

  • Aerial cable correctly attached to pole. I.e. screw hook / bandit tie.<br>

  • Minimum ground clearance maintained.<br>

  • Nylon insulator fitted at building terminations.<br>

  • Correct cable type and size used.<br>

  • Correct separation from other services. (e.g. Metal objects - Power/Optus).<br>

  • New 20mm lead-in conduit installed to standard; not exposed to termites and does not allow water to drain externally to house.<br>

  • Lead-in conduit neatly & securely attached to building.<br>

  • 200mm drip loop provided prior to entry into aerial fed PCD; No drip point for cable at customer premises.<br>

  • Lead-in conduit type and size to standard.<br>

  • Conduit at correct depth.<br>

  • Thread moisture seal installed (rubber grommet).<br>

  • RG6 /RG11 heat shrink present at tap port as per standard.<br>

  • PCD SITUATIONAL PHOTO

  • PCD INSTALLED

  • PCD cover secured correctly.<br>

  • Cable entry at correct orientation i.e. cable enters from below into PCD.<br>

  • Rubber boot correctly fitted in PCD.<br>

  • Isolator Installed.<br>

  • Isolator installed to standard.<br>

  • Splitter installed to standard.<br>

  • Amplifier installed to standard.<br>

  • Correct connector installed in PCD box.<br>

  • Connector fitted correctly.<br>

  • PCD Box correctly mounted

AUDIT OUTCOME

  • Site left safe.<br>

  • OUTCOME

  • ALL INFORMATION PROVIDED IS CORRECT

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.