Audit Protocol for MG SWP CP2.003
6.1 – Equipment Check
-
Has the Interference Testing been conducted as per MG PR WP/CP2.002 Potential Survey – Data Logging?
-
Does the copper sulphate solution cover the rod?
6.3 – Existing Known Foreign Structures
-
Does the CPU being tested have any existing foreign structure circuits?
6.4 – Determining Interference on Foreign Structures
-
Has the CPU been set to its maximum registered operating current?
6.5 – Finish
-
Have any adverse or beneficial potentials been recorded and reported to the 3rd party asset owners?