Title Page

  • Audit Title

  • Conducted on

  • Prepared by

  • Location
  • Job Description

  • Service Provider

  • Subcontractor

  • Crew Leader

Audit Protocol for MG SWP CP2.003

6.1 – Equipment Check

  • Has the Interference Testing been conducted as per MG PR WP/CP2.002 Potential Survey – Data Logging?

  • Does the copper sulphate solution cover the rod?

6.3 – Existing Known Foreign Structures

  • Does the CPU being tested have any existing foreign structure circuits?

6.4 – Determining Interference on Foreign Structures

  • Has the CPU been set to its maximum registered operating current?

6.5 – Finish

  • Have any adverse or beneficial potentials been recorded and reported to the 3rd party asset owners?

Comments and Sign Off

  • Comments and Audit Summary

  • Auditor(s) sign off

  • Auditee (Crew Leader) sign off

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.