Title Page

  • Audit Title

  • Job Description

  • Conducted on

  • Prepared by

  • Location
  • Service Provider

  • Subcontractor

  • Crew Leader

Audit Protocol for MG SWP CP3.001

6.1 – Confirm Unit Details

  • Have CPU details been recorded correctly in the spreadsheet?

6.2 – Is the unit operational?

  • Was the CPU checked for correct operation?

6.3 – Check Unit and Record Fault

  • If a fault was suspected to be present, was the fault-finding procedure followed correctly?

  • Was the 240v power isolated prior to testing inside the cabinet?

6.4 – Is the unit operational?

  • Was the CPU checked for correct operation?

6.5 – Record Details of Unit Fault and Notify Supervisor

  • If a fault was detected, were details of the fault recorded and the Supervisor notified?

6.6 – Record Output Current of each Pipeline Circuit

  • Were the outputs of each pipeline circuit measured and recorded?

6.7 – Does the unit require adjustment?

  • If required, was the output of the unit adjusted?

6.8 – Adjust Cathodic Protection Unit

  • If required, was the adjustment performed correctly?

6.9 – Record General Condition of Cabinet, Hinges and Locks, and Internal Wiring

  • Has the general condition of the CPU been checked?

6.10 – Record any Access Problems Identified

  • If identified, were there any problems with the cabinet recorded?

6.11 – Is it monthly monitoring or six monthly maintenance?

  • Has the correct monitoring and maintenance activity for the unit been determined?

6.12 – Finish Monthly Monitoring

  • Has the unit been reinstated and made safe?

6.13 – Maintenance Inspection of CPU

  • Have the permantly installed meters been verified against a multimeter?

  • Have voltage and current outputs been measured and recorded?

  • If required, has a loop resistance check been conducted in accordance with MG SWP CP3.002?

6.14 – Maintenance Inspection of Ground Bed

  • Has the surrounding area been checked for any ground disturbance or new structures near the cable routes?

6.15 – Finish Maintenance Inspection

  • Has the unit been reinstated and made safe?

  • If required, have SAP Notifications been raised for any faults found on the CPU?

Comments and Sign Off

  • Comments and Audit Findings Summary

  • Auditor(s) sign off

  • Auditee (Crew Leader) Sign Off

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.