Title Page
-
Audit Title
-
Job description
-
Service Provider
-
Subcontractor
-
Crew Leader
-
Location
-
Conducted on
-
Prepared by
Audit Protocol for MG SWP CP3.007
6.1 – Receive Work Instruction to conduct Soil Resistivity
-
Was a work instruction provided before commencement of works?
6.2 – Soil box test of sample?
-
If testing in a soil box, was a sample obtained?
6.3 – Pack Sample into Soil Box
-
Was the sample packed correctly in the soil box?
6.4 – Connect Soil Box to Earth Tester
-
Have the leads been connected correctly?
6.5 – Measure Resistance
-
Has the resistance been measured?
6.6 – Determine Resistivity
-
Was the resistivity calculated correctly?
6.7 – Clean Soil Box
-
Was the soil box cleaned correctly?
6.8 – Record Results
-
Have the results been recorded?
6.9 – Submit Results to Supervisor
-
Have the results been submitted to the Supervisor?
6.10 – Install Pegs
-
Are the electrodes installed at required spacing and depth?
6.11 – Connect Electrodes
-
Have the electrodes been connected to the correct terminals?
6.12 – Measure the Resistance
-
Has the resistance between calculated correctly?
6.13 - Finish
-
Has the site been packed up and made safe?
Comment and Sign Off
-
Comment and Audit Finding Summary
-
Auditor(s) Sign Off
-
Auditee (Crew Leader) Sign Off