Audit Protocol for MG SWP CP CP4.003
6.1 – Receive Instructions to Conduct Insulating Flange Test
-
Have instructions for the test been issued by the Supervisor?
6.2 – Are you using the Transformer Ring Method?
-
Has the transformer ring method been considered to perform the test?
6.3 – Attach Transformer Ring
-
Has the transformer been clamped on correctly?
6.4 – Connect AC Generator
-
Is there a good electrical connection between the probes and pipe?
6.5 – Test Flange Insulation
-
Has the flange insulation been tested for soundness?
6.6 – Is the flange faulty?
-
Has the secondary winding been checked for a voltage?
6.7 – Record Details
-
If detected, have the details of the faulty flange been recorded in SAP?
6.8 – Report Results
-
Have the results then been reported to the Supervisor?
6.9 – Attach Detector
-
Has the detector been attached to the pipe correctly?
6.10 – Bridge Out Insulating Joint
-
Was the insulating joint bridged out with a bonding strap?
6.11 – Connect AC Generator
-
Has the AC Generator been connected correctly?
6.12 – Measure and Record Voltage
-
Was the generator switched on, and observed for current flow?
-
Was the displayed voltage recorded on the generator?
6.13 – Disconnect Bonding Strap
-
Was the bridging bond strap disconnected?
6.14 – Measure Voltage of the Detector
-
Was the new voltage measured on the generator?
6.15 – Is there a difference in the readings?
-
Were the two readings compared for a large difference?
6.16 - Finish
-
Was the equipment packed up, and site made safe?
Comment and Sign off
-
Comments and Audit Finding Summary
-
Auditor(s) Sign Off
-
Auditee (Crew Leader) Sign off