Audit Protocol for MG SWP CP5.001

6.1 Start Design

  • Is the DC voltage suitable for the output type?

6.2 Determine Anode Bed Design using MG PR CP5.002

  • Has MGN PR CP5.002 been referred to?

6.3 Select suitable Transformer Rectifier

  • Is the transformer rectifier suitable?

6.4 Determine Method of Output control

  • Has the most appropriate method of output control been achieved?

6.5 Determine Performance Specifications

  • Has the expected performance of the cathodic protection systems been calculated correctly?

6.6 Draw Necessary Diagrams

  • Have the necessary diagrams been drawn?

6.7 Submit Performance Specification and Diagrams for Approval

  • Have specification and diagrams been approved by the appropriate level of authority?

6.8 Finish

  • Have all works been completed as per MG SWP CP5.001

Sign off & Comments

  • Other comments

  • Auditor(s)

  • Auditee (Crew Leader)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.