Audit Title
-
Job Description
-
Service Provider
-
Subcontractor
-
Crew Leader
-
Conducted on
-
Location
-
Prepared by
Audit Protocol for MG SWP CP6.003
6.1 – Complete anode bed design using MG SWP CP5.003
-
Was MG SWP CP5.003 followed to design the galvanic anode installation?
6.2 – Excavate for anode according to standard drawing S84-4-2
-
Has the trench been prepared correctly for the anodes?
6.3 – Lay anodes flat, head to tail at equal centres, in the trench
-
Have the anodes been laid correctly in the trench?
6.4 – Are these magnesium anode?
-
Are these magnesium anode?
6.5 – Run black anode cables back to test point and terminate
-
Have the black anode cables been run as shown on test point drawings?
6.6 – For zinc anodes, remove about 25mm of insulation from anode tail and header cable
-
Have cables been run as per standard drawing?
6.7 – Make connection with line tap
-
Is there connection with line tap?
6.8 – Wrap connection with butyl rubber insulation tape and lay header cable into trench
-
Has the connection been wrapped and header cable laid in trench correctly?
6.9 – Run anode header cable into test point and backfill trench
-
Have the anodes been installed in natural backfill?
6.10 – Record details on test point database and field test book
-
Have all details been recorded in database and test book (including field sketch if required)?
6.11 – Register anode with VEC
-
Does the galvanic anode need to be registered with VEC?