Audit Protocol for MG SWP CP7.001
6.1 – Start Chart
-
Have checks been carried out and appropriate transformer output settings selected?
6.2 – Carry Out Checks Before “Switch On”
-
Have all physical connections been checked and 240 volt supply is available?
6.3 – Carry Out Polarity Check After “Switch On”
-
Does the voltmeter show the pipe to be negative?
6.4 – Check Loop Resistance Measurements
-
Has the loop resistance been recorded?
6.5 – Is the CPU metered?
-
Has it been identified as a metered or unmetered electricity supply?
6.6 – Adjust Metered Cathodic Protection Units
-
Has the metered CPU been adjusted within registered maximum settings?
6.7 – Adjust Unmetered Load Limited CPU
-
Has the unmetered CPU been set up correctly and final settings recorded?
6.8 – Determine Interference on any Secondary Structures
-
Was the Australian Standard AS 2832.1 followed correctly to test interference to secondary underground structures?
6.9 – Record all Details on Low Output Commissioning Form MG COM CP7.001.1
-
Have all details been recorded on form MG COM CP7.001.1 and forwarded to the Supervisor?
6.10 - Finish
Comment and Sign off
-
Comments and Audit Finding Summary
-
Auditor(s) Sign Off
-
Auditee (Crew Leader) Sign off