Title Page

  • Audit Title

  • Job Description

  • Service Provider

  • Subcontractor

  • Crew Leader

  • Location
  • Conducted on

  • Prepared by

Audit Protocol for MG SWP CP7.002

6.1 – Start Chart

  • Has there been several days between the before and after measurements?

6.2 – Measure the potential of the galvanic anodes prior to connection

  • Has the galvanic anodes potential prior to connection been measured and recorded correctly?

6.3 – Measure the potential of the pipeline prior to connection of anodes

  • Has the pipeline potential prior to connection been measured and recorded correctly?

6.4 – Measure the potential of the pipeline after connection of anodes

  • Has the pipeline potential after connection been measured and recorded correctly?

6.5 – Measure current between anodes and pipelines

  • Has the current between anodes and pipeline been measured and recorded correctly?

6.6 – Finish

  • Have the test pint details been updated in SAP?

Comment and Sign off

  • Comments and Audit Finding Summary

  • Auditor(s) Sign Off

  • Auditee (Crew Leader) Sign Off

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.