Title Page
-
Audit Title
-
Job Description
-
Service Provider
-
Subcontractor
-
Crew Leader
-
Location
-
Conducted on
-
Prepared by
Audit Protocol for MG SWP CP7.001
6.1 – Start Chart
-
Have checks been carried out and appropriate transformer tapping and settings selected?
6.2 – Carry Out Checks Before “Switch On”
-
Have all physical connections been checked and 240 volt supply is available?
6.3 – Carry Out Polarity Check After “Switch On”
-
Does the voltmeter show the pipe to be negative?
6.4 – Check Loop Resistance Measurements
-
Has the loop resistance been calculated correctly?
6.5 – Is the CPU metered?
-
Is it a metered 240v supply to the CPU?
6.6 – Adjust Metered Cathodic Protection Units
-
Has the metered CPU been adjusted?
6.7 – Adjust Unmetered Load Limited CPU
-
Has the unmetered CPU been set up correctly and final settings recorded?
6.8 – Determine Interference on any Secondary Structures
-
Was the Australian Standard AS 2832.1 followed correctly to test interference to secondary underground structures?
6.9 – Record all Details on Low Output Commissioning Form CPS2303-20A
-
Have all details been recorded and forwarded to the Supervisor?
Comment and Sign off
-
Comments and Audit Finding Summary
-
Auditor(s) Sign Off
-
Auditee (Crew Leader) Sign off