Audit Protocol for MG SWP CP7.001

6.1 – Start Chart

  • Have checks been carried out and appropriate transformer tapping and settings selected?

6.2 – Carry Out Checks Before “Switch On”

  • Have all physical connections been checked and 240 volt supply is available?

6.3 – Carry Out Polarity Check After “Switch On”

  • Does the voltmeter show the pipe to be negative?

6.4 – Check Loop Resistance Measurements

  • Has the loop resistance been calculated correctly?

6.5 – Is the CPU metered?

  • Is it a metered 240v supply to the CPU?

6.6 – Adjust Metered Cathodic Protection Units

  • Has the metered CPU been adjusted?

6.7 – Adjust Unmetered Load Limited CPU

  • Has the unmetered CPU been set up correctly and final settings recorded?

6.8 – Determine Interference on any Secondary Structures

  • Was the Australian Standard AS 2832.1 followed correctly to test interference to secondary underground structures?

6.9 – Record all Details on Low Output Commissioning Form CPS2303-20A

  • Have all details been recorded and forwarded to the Supervisor?

Comment and Sign off

  • Comments and Audit Finding Summary

  • Auditor(s) Sign Off

  • Auditee (Crew Leader) Sign off

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.