Title Page

  • Project Name:

  • Project No.

  • Slab Level:

  • Pour Number:

  • Select date

  • Leading Hand:

1. Engineer / Main Contractor approval of stressing records

  • Approved:

  • Approved by: DO NOT proceed until approval received

  • Select date

2. Preparation to grout

  • Cut strands for sufficient cover

  • External blocks pained with Sika Monotop 610

  • Stressing pockets sealed with dry pack mix<br>(ensure dry mix includes Masonry AU1)<br>20Kg dry sand cement to 100ml of Masonry AU1

  • Are all pockets sealed and tightly packed with dry mix

  • Check ducts are clear and have free passage of air

3. If ducts are not clear, report to leading hand, drill and clear

  • Are all ducts now clear?

  • How many needed to intermediate points added

  • Which tendons

Comments / Notes

  • Please add comments / notes as required

  • Main Contractor (Print Name and Sign)

  • Fortec Leading Hand (Print Name and Sign)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.