ALL SITE MANAGERS/SUPERVISORS ARE REQUIRED TO:
-
Assess the hazards in the immediate work area on a DAILY basis for each task and complete this form
-
Discuss the Hazards and Controls with their team and verify understanding
-
Put in place extra precautions and controls, as necessary
-
Check throughout the day that the precautions and controls are being followed by the team and are working effectively
GENERAL ASSESSMENT
-
Have all personnel been adequately trained?
-
Is all plant and machinery in working order?
-
Do all personnel have adequate P.P.E?<br>
-
Is the site in a safe condition for working?
-
Has a safe pedestrian access been established?
-
Is vehicular traffic management in place?
-
Has a toolbox talk taken place?
-
NOTE : all 'Possible Hazards' listed should be checked to determine if they are applicable to the works. Add any additional hazards identified to the list and put controls in place. Controls MUST be put in place to achieve a Residual Risk score of 5 or 6 for each hazard.
Hazard Assessment checklist
-
Others working nearby?
-
Risk score
-
Control Measures
-
Residual risk
-
Others working below?
-
Risk score
-
Control Measures
-
Residual risk
-
Pedestrians and Public access?
-
Risk score
-
Control Measures
-
Residual risk
-
Obstructions or Projections?
-
Risk score
-
Control Measures
-
Residual risk
-
Manual handling?
-
Risk score
-
Control Measures
-
Residual risk
-
Working at heights?
-
Risk score
-
Control Measures
-
Residual risk
-
Danger of Slips, trips, falls?
-
Risk score
-
Control Measures
-
Residual risk
-
Noise and Vibration?
-
Risk score
-
Control Measures
-
Residual risk
-
Power tools?
-
Risk score
-
Control Measures
-
Residual risk
-
Hand Tools?
-
Risk score
-
Control Measures
-
Residual risk
-
Excavations and openings?
-
Risk score
-
Control Measures
-
Residual risk
-
Vehicles?
-
Risk score
-
Control Measures
-
Residual risk
-
Vehicles in restricted spaces?
-
Risk score
-
Control Measures
-
Residual risk
-
Sharp edges?
-
Risk score
-
Control Measures
-
Residual risk
-
Alternate power supply?
-
Risk score
-
Control Measures
-
Residual risk
-
Welding activities?
-
Risk score
-
Control Measures
-
Residual risk
-
Poor Lighting?
-
Risk score
-
Control Measures
-
Residual risk
-
Confined spaces?
-
Risk score
-
Control Measures
-
Residual risk
-
Chemicals, adhesives, oils?
-
Risk score
-
Control Measures
-
Residual risk
-
Welding fumes, dust, gases?
-
Risk score
-
Control Measures
-
Residual risk
-
Mechanical lifting?
-
Risk score
-
Control Measures
-
Residual risk
-
Access to worksite?
-
Risk score
-
Control Measures
-
Residual risk
-
Climatic conditions?
-
Risk score
-
Control Measures
-
Residual risk
-
Underground services?
-
Risk score
-
Control Measures
-
Residual risk
-
Overhead power lines?
-
Risk score
-
Control Measures
-
Residual risk
-
Live cables?
-
Risk score
-
Control Measures
-
Residual risk
I have been briefed in my role and understand the hazards contained in this risk assessment and will comply with the control measures to the best of my ability to reduce the risk of injury.
-
Signed by
-
Signed by
-
Signed by
-
Signed by
Risk Assessment Prepared By:
-
Add signature
Visitors to the site
-
Visitors on site?
-
Oranisation
-
Arrival Time
-
Departure Time
-
More visitors on site?
-
Oranisation
-
Arrival Time
-
Departure Time
-
More visitors on site?
-
Oranisation
-
Arrival Time
-
Departure Time
-
More visitors on site?
-
Oranisation
-
Arrival Time
-
Departure Time
-
Signed off by Client Representative:
Post Task Inspection Checklist
-
Post job clean-up
-
Installed materials secured?
-
Are safety signed required?
-
Barricades installed where needed?
-
Equipment shut down and/secured?
-
Post task inspection completed by: