Title Page

  • Date

  • Tech Survey Prepared by

  • Park Homeowner Name

  • Park Home Address

Drawn Plans

  • Please take a photo of the Ventilation Diagram

  • Property type

  • Size of Park Home SQM

  • Width of park home in meters?

  • Length of park home in meters?

  • Take photos of all elevations of the property

  • Is there adequate skirt ventilation? Photos required of at least 6 skirt vents (we need at least 1 on each short end and 2 on each long end)

  • Skirt Material

  • What skirt ventilation strategy do we need to implement? Multiple Selections Allowed

Under The Park Home

  • Number of Jacks (8 required for a Single, 16 required for a double) - Please ensure jacks are supporting the chassis, we don't count jacks not on the chassis.

  • How many additional Jacks are required?

  • What is the condition of the Jacks (photo required)

  • What is the condition of the chassis (photo required)

  • Is there a minimum of two accessible hatches, and are they situated opposite sides of the axle stands?

  • How many hatches need to be installed?

  • Is the whole of the underfloor accessible?

  • Bottom of chassis to base of Park home (high point) ?

  • Bottom of chassis to base of Park home (low point) ?

  • Depth of timber joist to base of Park Home?

  • Are there any Dangers Visible? this may include evidence of rodent activity, leaking pipes, exposed wiring

  • Please state the dangers

  • Is there any pipe work that will require lagging as part of the installation?

  • What size pipe is present

  • How much pipe lagging will be required?

  • Does the Gas Pipe run under the floor?

  • What is the base made from?

  • Is there pre existing insulation present

  • What is the condition of the insulation

Ventilation Strategy

Inside Inspection of the Park Home

  • Is there a boiler?

  • What is the make and model of the boiler? (please take a photo as well as a written description of the boiler make and model - this is for the Gas Engineer if he needs to extend the flue)

  • Please take a photo of the top part of the boiler to check the flue is attached correctly

  • Is there a gas or electric fire in any of the rooms?

  • Please take a photo of the gas fire

  • Is there a core vent?

  • Please inform the customer they will need a core vent

  • Please take a photo of the electric fire and the socket/fuse spur it is wired into (we need to ensure that this is electric and not gas as a core vent is needed if there is a gas fire)

  • Please take a photo of the Log Burner or Back Burner

  • Is there a core vent?

  • Please inform customer they will need a core vent

  • Please take a photo of the Oil Fire

  • Is there a core vent?

  • Please inform the customer they will need a core vent

  • How many bedrooms are there?

  • Please take a picture of the Heating Controls / Thermostat

  • What type of lights are in the park home (Please take a picture of 1 light)

Ventilation Strategy

  • How many wet rooms are there?

  • Does the Property have adequate background ventilation by means of window trickle ventilation or other room ventilation in habitable rooms?

  • Please ask the customer if they would want a Window Trickle Vent or a Rectangle Wall Vent to be installed, and fill in the information below.

  • Background Ventilation Strategy

  • Does the Property have adequate background ventilation by means of Door undercuts of at least 7 600 mm2 beneath all internal doors, above the floor finish, to allow air to move through the dwelling in habitable rooms? ( approx 7-10mm gap) (photos required)

  • What doors will need adjusting?

Paperwork

  • Please select the managing agent

  • Photo of the signed City Energy Customer Declaration

  • Photo of the signed Purchase Agreement (PPHS Purchase Agreement)

  • Photo of the Condition Report

  • Photo of the Permission to Work if required

  • Photo taken of the Ventilation and Distance Diagram on Page 1?

Have you got the following evidence? (please don't attach here send separately via Google Drive or upload straight to the CRM)

  • Bank Statements (3 months), Or proof of means tested benefits (in date), Or 2021 P60

  • Pitch Agreement (original paperwork if possible and not a pitch fee review)

  • Copy of council tax (needed to show council resident comes under)

  • Photo of the Condition Report

  • Has the customer signed the declaration on the Fast Fields app?

  • Photo taken of the Ventilation and Distance Diagram on Page 1?

  • Photo of the signed Contract LAD (Client Declaration)

  • Photo of the signed Contract PPHS (PPHS Purchase Agreement)

  • Photo of the Condition Report

  • Photo of the Permission to Work if required

  • Photo taken of the Ventilation and Distance Diagram on Page 1?

  • Photo taken of the Ventilation and Distance Diagram on Page 1?

  • Photo of the signed Contract LAD (Client Declaration)

  • Photo of the signed Contract PPHS (PPHS Purchase Agreement)

  • Photo of the Condition Report

  • Photo taken of the Ventilation and Distance Diagram on Page 1?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.