Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1.0 AUDIT - INFORMATION
-
Is this audit for Practical Completion.
-
Is this audit for, Water or Recycled Water
-
JCA Landconsultants Reference Number:
-
Retail Water Authority
-
Contractor:
- Adept drainage
- Azzona drainage
- Canfam
- Califam
- DI Carlo drainage
- Comdain
- DR & JP Steven's
- H2O Constructions
- Fulton Hogan
- M K Young
- Mooroolbark Excavation's
- Bardonz Excavation Australia
-
Is contractors representative present for this audit
2.0 AUDIT - CONFORMING ITEMS
-
Is all excess spoil removed.
-
Water trench subsidence.
-
Ground subsidence /top soil and seeding completed.
-
Valve spindles in place and at excepted depths
-
Have hydrant marker post been placed at completion of works
-
Clearance from authority's have been obtained.
-
Any obvious signs of leak's?
-
Water tapping location markers on kerb?
-
Was there any construction not as per design?
-
We're design plans amended and forwarded to asset recorder and water authority.
-
Have damaged road and footpaths been repaired/fixed after completion of works.
-
Any construction concessions sought from water authority. If yes confirmation of concession recorded in form G
-
Have all works as per conditions of agreement have been completed.
3.0 ALL NON-CONFORMANCES RECTIFIED
-
Date all items rectified
-
Construction verification paperwork sent to JCA LANDCONSULTANTS
-
Photos of inspection