Audit
Is this audit for Practical Completion.
Is this audit for, Water or Recycled Water
JCA Landconsultants Reference Number:
Retail Water Authority
- Adept drainage
- Azzona drainage
- Canfam
- Califam
- DI Carlo drainage
- Comdain
- DR & JP Steven's
- H2O Constructions
- Fulton Hogan
- M K Young
- Mooroolbark Excavation's
- Bardonz Excavation Australia
Is contractors representative present for this audit
Is all excess spoil removed.
Water trench subsidence.
Ground subsidence /top soil and seeding completed.
Valve spindles in place and at excepted depths
Have hydrant marker post been placed at completion of works
Clearance from authority's have been obtained.
Any obvious signs of leak's?
Water tapping location markers on kerb?
Was there any construction not as per design?
We're design plans amended and forwarded to asset recorder and water authority.
Have damaged road and footpaths been repaired/fixed after completion of works.
Any construction concessions sought from water authority. If yes confirmation of concession recorded in form G
Have all works as per conditions of agreement have been completed.