Title Page
-
Date survey was conducted
-
Customer name
-
Survey done by
- Steve Clark
- Ralph Medcalf
- Lewis Williams
- Mark Conway
- David Mosscrop
- Other
-
Please Enter Your Name:
-
Location
-
Is there parking available on site?
-
If possible, please add location of nearest available location to park
-
Were Toll Roads or Crossings used to get to this site?
-
Please give details:
Washroom Survey
- WASHROOM
Propelair Washroom Survey Report Site-based information.
Section 1: Information on washroom whereabouts inside the building
-
1. What floor level is it located on?
- Basement
- Ground
- 1st
- 2nd
- 3rd
- 4th
- Other
-
2. Type of washroom
-
3. Number of toilets
-
4. Please measure the literage of 1 flush. To do this, disconnect the water supply from the cistern to the toilet, and flush the cistern into a bucket. This is more accurate than measuring the max-min water levels within the cistern, as it takes the pouring water (which is immediately syphoned into the toilet) into account.
-
5. It is normal to install flush counters during the site survey. Are these being installed?
-
Why not?
-
How many are being installed?
-
When will the counter readings be next read?
-
Who is going to take the counter readings?
-
6. Please take a photos of the washroom.
Section 2: Installation and the void
-
7. How big is the gap between the back wall of the cubicle and the centre of the door swing (in mm)?
-
Take photos if needed
-
8. Is there IPS panelling?
-
What is the panelling made of?
- MDF
- Glass Reinforced Plastic
- Metal
- MDF & Metal
- GRP & Metal
- Other
-
Is the IPS panelling full or half height?
-
Will blanking off plates be required?
-
Please give details of size, shape and colour required
-
How many blanking plates are required
-
Take a photo if required
-
Will custom built boxing required?
-
Please take measurements and photos
-
9. What is the depth of the void, from the back wall to the front of the IPS Panel
-
10. What is the thickness of the divide between the cubicle where the pan is and the void where the cistern will be located (in mm)
-
11. Will the cisterns be Standard or Reverse mounted?
-
12. Are there any obstructions for mounting the new cistern?
-
13. Will standard length (500mm) water hoses be long enough?
-
Will 750mm hoses be long enough?
-
14. Are 90 degree water hose cuffs required to lower the cistern?
-
How many are required?
-
15. Are there any obstacles within the void that will make it extremely difficult/not possible to install any part of the Propelair system?
-
Please give details
-
Please take photos
-
16. What size is the water supply:
- 15mm Copper
- 22mm Copper
- 28mm Copper
- Other
-
Please give details
-
Please take photos
-
17. Where does the water supply come from?
-
Please give details
-
Please add any additional photos relating to this section.
-
Please add any additional information relating to this section.
Section 3: Drainage (soil pipe and sewerage)
-
18. Is the soil pipe below ground level?
-
19. What is the material of the waste pipe?
- Plastic
- Cast Iron
- Clay / earthenware
- Fusion Welded Thermo-Plastic
- Copper
-
20. What is the soil spigot type (select multiple answers if required)?
- 90 degree bend
- 45 degree bend
- 92 degree tee
- Pan connects into floor with Multi-quick fitting
- Unable to see
- Straight connection through wall
-
21. What is the height of the waste outlet? (mm)
-
22. Will any of the toilets require a 40mm plinth to raise the pan?
-
How many are required?
-
23. Is there enough space to install latest spec venting
-
24. Is there a vertical stack vented to atmosphere
-
25. Does the washroom have an external wall
-
How thick is the wall in mm
-
How far is the nearest external wall in metres (approximately)
-
26. Is there a rodding access
-
27. Does the washroom have a drainage inspection chamber within it?
-
Please locate the nearest inspection chamber and give details of it's location and the type of drain key required to open it.
-
Please take a photo
-
28. Is existing waste installed in a way that promotes crossflow?
-
Please state what is required to correct this.
-
29. How many non-return valves are required for the secondary overflow?
-
30. Are additional non-return valves required? (Basins, urinals)
-
Please state how many and what sizes
Section 4: Additional information for this washroom.
-
31. Does the washroom have removable ceiling tiles?
-
32. Does the washroom use paper towels for hand drying?
-
33. Does the washroom have single sheet toilet roll dispensers?
-
34. Details of electrical supply present
- None
- Existing appliances only
- Current toilets have a power supply for flush mechanism
-
35. Is there an inspection chamber inside the washroom?
-
Is there an inspection close-by outside the washroom?
-
Please enter any additional notes on the installation.
-
Please add any additional sketches as appropriate.
-
Take any additional photos as required.
Section 5: Site-level notes and completion (only once per site NOT per washroom).
Health and safety considerations
-
Generic site risks:
-
Specific locale risks:
-
Hazardous conditions:
-
Hazardous materials:
-
Environmental risks:
Any additional comments, sketches, or photographs:
-
Comments:
-
Sketches:
-
Photographs:
Names and signatures:
-
Surveyor name:
-
Surveyor signature:
-
Client representative name:
-
Client representative email:
-
Client representative signature:
-
Time and date stamp: