Title Page
-
Job Name & Room Name
-
Job Number
-
Rack Building Tech
-
Project Manager
-
Conducted on
-
What size rack is being built? (RU's)
-
Has the rack elevations been altered from the drawings?
-
Have drawings been red lined and submitted?
-
Take a picture of the front and rear of the rack to show the elevation and organization of the rack.
-
Verify that all AV cabling within the rack at this time has been secured using only velcro. Only power cabling is permitted to be secured with zip ties.
-
Has Q fan been able to be installed at this point?
-
Have labels been attached to cables currently in rack? (power cables included)
-
Have power bricks properly secured in some fashion to the rack to avoiding falling out of the rack especially during transport?
-
Do all Phoenix (captive screw) terminations have a zip tie strain relief attached?
-
Spot check current cable terminations and ensure standards are being met.
-
Do all DB-9 connections have shells installed on them?
-
Any additional notes concerning current status of rack before being sent out?
-
Has the rack been cleaned of all wire clippings? Have all blanks been installed and lacing bars properly installed?