Title Page
-
Site conducted
-
Conducted on
-
Location
-
Auditor
CCP5 - Maintaining PIPS During Rework/Repack, WP5 - Maintaining Phytosanitary Security During Post Pack Inspection
-
Notify Zespri QA in advance of repacking/reworking
-
Notify Zespri QA in advance of repacking/reworking to lift market restrictions
-
Inspection area is clean, pest and contaminant free and verified by Zespri QA
-
Product matches the pallet list
Packaging
-
Any new packaging to be kept covered when not in use and inspected prior to use
-
Packaging and Label traceability forms being completed
Rework/Repack
-
Only one KPIN/batch to be reworked at a time
-
Each pallet is check of against the Pallet in Store list
-
Complete a 50 fruit reject analysis per pallet
-
Product being reworked/repacked to be kept separate from all other product by 1m outside coolstore
-
Ensure Reworked/Repacked packs are staked onto the correct pallet and pallet cards are correct.
-
Product check by Auditor
ISPM15 Verification
-
Pallet bases are not damaged, free of dirt, debris and other contamination
-
Record and verify the status of all new pallets on QUAl-FORM-006 Repack Inspection Record
Donor Fruit
-
A rolling system may be used, if not donor pallets are identified electronically with and IJ hold
-
Details of Donor fruit used is recorded electronically or on QUAL-FORM-006
-
All Donor fruit must have at least the same market status
Verify Rework/Repack
-
If Rework/Repack is done to remove defects, a minimum 200 fruit sample per pallet is reinspected to confirm that defects have been removed
-
The ISO date of the Rework/Repack is recorded on the pallet card
-
If Rework, for a PPQI failure, is abandoned record A next to the ISO date
-
If Rework/Repack is done to remove market restrictions, has a minimum 600 fruit sample been inspected by a CCP2 ZAP/MPI approved person
-
Market restrictions are only lifted when confirmed by Zespri QA
-
CCP5 ZAP to verify that PIPS have been maintained by printing and signing the Repack Record sheet on a daily basis
Pallet Inspection
-
Pallet inspection are being carried out at regular intervals, eg 1 in 10 completed pallets.
-
Pallet inspection are recorded on QUAL-FORM-042 Finished Pallet Inspection Form
Training
-
Staff trained in correct inspection techniques prior to repacking
Abandoning Repack
-
Has any repack been abandoned for any KPINS/Batches
-
Has a minimum of 1000 fruit been checked
-
Has the Decision Criteria for Abandon Repack Due to Low Fruit Loss been followed correctly
Process Improvements
-
Has there been any changes to process as a results of CAPA's, Zespri Audits etc
-
What has been implemented
Uncontrolled Documentation
-
Have there been any uncontrolled documentation sighted
Additional Comments
-
Any additional comments