Front Entrance Area
-
Polish and clean front entrance doors
-
Repair wallpaper to the right of the coat check door
-
Clean, polish and reseal marble floor
-
Repair countertop in large bathroom
-
Repaint Bathroom Hallway
Main Dining Room
-
Floor protectors on all chairs
-
Table levelers on all tables - requires tap and die process
-
Buff and reseal dinning room floor
-
Realign bus station doors in Q3 and Q4
-
Clean fireplace stone on West side at the top
-
Touch up table tops on: 14, 13,
-
Clean booth and chair seats upholstery throughout dining room - minor repair needs as well for buttons
-
Wood trim base boards - restain
-
Repaint inside of doors to patio
-
Replace carpet in booths 51 and 81
-
Restain inside walls of bus stations Q3 south
-
Fix door on right side of the Founders Room credenza
-
Fix trim and restain wood on trim of the Founders Room credenza
-
Touch wood trim at top of Founder's room sliding doors
-
Restrain wood bus station in Q1
-
Fix base board in Q1 left
-
Touch up of black dining room chairs and bar stools
-
Realign cabinet doors in Q3 and Q4
-
Restain bus station front panels in Q4
-
Reprint wall leading into back hall to kitchen
-
East side of fireplace - fix, re-utilize or cover
Bar
-
Regrout bar top and realign bar top by North end of bar
-
Add wainscoting around wood cabinet on back bar
-
Replace copper pipe (drain) on server side of service bar
-
Deep clean wall area around wine storage
-
Steam clean wall to behind the bar
-
Restain or replace the wooden cabinet behind the bar
-
Add a kick plate under the reach in coolers behind the bar
-
Raise soda lines off floor for cleaning purposes
-
Touch up stain along the left side wood trim by left register
Hallway to kitchen
-
Fix base board at entrance going into the kitchen on the left side
Upper level kitchen
-
Repair bread hot box electrical cord
-
Fix wall at dishwasher - regrout and seal at return area
-
Resilicone entire dishwasher area
-
Remove wooden shelf in dish area and replace with metal
-
Replace tiles and coving at slop sink
-
Repair or replace grease trap by 3 compartment sink and raise so it can be cleaned underneath
-
Resilicone 3 compartments ink
-
Regrout flooring throughout kitchen as needed
-
Repair or replace two ovens in prep area (lower over on both stacks)
-
Fix security camera system in Chef's office
-
Repair handles on 6 burner stove (apps, pasta station)
Cafe Shop
-
Eliminate electrical cords from TV's - hide or run electrical to them
-
Repair and paint doors to cafe - outside
Back Hallway and Mechanical Room
-
Replace inside lock - gold
-
Replace wood with see through replacement on screen door
-
Replace computer on left side desk
Beer Cooler and Ice Machine area
-
Steam clean inside of keg cooler and shelving
-
Purchase and attach scoop holder for ice machine
Employee Locker Area
-
Replace or refurbish all employee lockers and change master lock on all
Employee Changing Rooms
-
Replace mirror on outside wall on left side
-
Comida area
Large Ice Machine and Cages / Storage Areas in Tunnel
-
Fix lock on drawer storage - silver
-
Add second cooler to liquor storage cage
Pastry Kitchen
Accounting Office
Large office / Events office
Linen Cage
Garbage Room and Dock area
-
Repair two doors to loading ramp
-
Replace tires on forklift
-
Repair or replace power hand jack
-
Repair or replace manual hand jacks
-