Title Page
-
Site conducted
-
Job Number
-
Conducted on
-
Location
GENERAL
-
Builder's Sign on Site and Visible
-
Bin on Site
-
Site Safety Management Plan check
PLUMBING
-
Make sure the void scaffold is present and installed safety
-
Floor joist penetrations as per installation guide
-
Bath to be filled with 100mm of water (to deter standing in it)
-
Tundish fitted at 2nd fix but not sealed (2)
-
Puddle flanges - fixed and screwed down
-
All pipework centre of studwork
-
Power/Plumb to island bench
-
Sewer drain connected and clear of debris (2)
-
Pressure test pipes
-
Shower outlets capped 20mm away from wall
-
Rain water tank position and loop as per plan
-
Balcony drains installed
-
Flood gullies to be 50mm below floor trap
ACKNOWLEDGEMENT
-
I have read and understood the requirements of this inspection as stated in Rivergum Homes Policies & Procedures