Title Page

  • Site conducted

  • Job Number

  • Conducted on

  • Location

GENERAL

  • Builder's Sign on Site and Visible

  • Bin on Site

  • Site Safety Management Plan check

PLUMBING

  • Make sure the void scaffold is present and installed safety

  • Floor joist penetrations as per installation guide

  • Bath to be filled with 100mm of water (to deter standing in it)

  • Tundish fitted at 2nd fix but not sealed (2)

  • Puddle flanges - fixed and screwed down

  • All pipework centre of studwork

  • Power/Plumb to island bench

  • Sewer drain connected and clear of debris (2)

  • Pressure test pipes

  • Shower outlets capped 20mm away from wall

  • Rain water tank position and loop as per plan

  • Balcony drains installed

  • Flood gullies to be 50mm below floor trap

ACKNOWLEDGEMENT

  • I have read and understood the requirements of this inspection as stated in Rivergum Homes Policies & Procedures

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.