Cover page
-
Depot/Site
-
Conducted on
-
Prepared by
-
Accompanied by
Pit safety
Pit Safety SOP1
-
1.0. Are the pits adequately protected with tensator straps around all four sides of the pit?
-
1.1. Are sunken workshops adequately protected with barriers to prevent falls, this includes where bus doors, front and back may overhang ?
-
1.2. Is all pit lights working?
-
1.3. Are pit edges marked with highlighted paint?
-
1.4. Are pit areas clean and tidy and free from slip trip or fall hazards such as trailing wires, debris or discarded tools and equipment?
-
1.5. Are pits free from spills and spill response equipment? (Spills must be cleared immediately not left to soak)
-
1.6. If pit jacks are fitted, are they secure? (Check for stop brackets on the track that prevent the pit jack from rolling off the track, particularly if connected to sunken workshops)
-
1.7 Are there sufficient warning signs to deter unauthorised access?
-
1.8. Are walk boards in place, suitably guarded with hand rails and have a SWL displayed?
-
1.9. Does the depot EM hold a risk assessment for pit safety? Is it reviewed at regular intervals?
-
1.10. Have staff received a tool box talk on pit safety in the last 12 months?
-
1.11. Are staff wearing suitable safety footwear in pit areas?
-
1.12. Are staff wearing bump caps when working under vehicles in pits?
-
1.13. Are staff wearing safety glasses when working under pits?
-
1.14. Where wheels have been removed from the bus, or suspension is being worked on, is the vehicle adequately protected with axel stands to prevent a drop risking trapping injuries?
-
Comments
-
Images
-
Comments
-
Images
Audit Sign off
Audit sign off
-
Good practice to share
-
Add media
-
Recommendations and suggestions for further development of the safety management system at this location
-
Add media
Please ensure all non conformance issues detailed in this audit, under each section, are transferred to the depot corrective action register and discussed at the monthly safety meeting. Please ask your Regional Safety Manager for further advice & support if you need it.
-
Check sheet completed by:
-
Check sheet signed off by name:
-
Any further comments for the depot leadership team.
-
Please send a copy of this check sheet to Dianne Gerrard.