Crane / Hiab on site
PPE Required for ActivityTask
-
Hard Hat, Hi Visibility Vest, Safety Glasses, Safety boots & gloves
Crane / Hiab on Site
-
Sequence of Basic Steps: Describe each step in the activity – most will have 4-8 steps. Follow the flow of the product or process.
Step 1
-
Crane / Hiab Placement
Potential hazards and risks Describe the key hazards and risks for each step – there will normally be more than one per step. Number each hazard e.g 1a, 1b, 1c; 2a, 2b, 2c.
-
1a Obstructing traffic
-
Initial Risk Assessment - Before the controls are in place. Refer to the risk assessment matrix
-
Control methods and level of control Describe the key/significant way to control the risk and then refer to the hierarchy of controls
-
Setup exclusion zone to minimize impact on vehicle and foot traffic
-
Level of Control
-
Residual risk assessment After all controls are in place. Refer to the risk assessment matrix.
-
1b Swinging equipment overhead
-
Setup exclusion zone
-
Level of Control
-
Training and competency
-
Level of Control
-
Remain clear of crane / hiab
-
Level of Control
-
Residual risk assessment After all controls are in place. Refer to the risk assessment matrix.