Title Page
-
Site conducted
-
Site Name
-
Date
-
Simpro Job Number
-
Location
-
Fantail Employee Name
-
Fantail Employee Contact Number
-
Fantail Employee Signature
-
Site Contact Person:
-
Site Contact Number:
-
Fantail H & S Representative: Erik Potgieter
-
Fantail H & S Contact Number: 021 249 3563
-
Document Number
Use of Refrigerant Gas
PPE Required for ActivityTask
-
Hard Hat, Hi Visibility Vest, Safety Glasses, Safety boots & gloves
Use of Oxy-Acetylene
-
Sequence of Basic Steps: Describe each step in the activity – most will have 4-8 steps. Follow the flow of the product or process.
Step 1
-
Handling, Storage & Transporting
Potential hazards and risks Describe the key hazards and risks for each step – there will normally be more than one per step. Number each hazard e.g 1a, 1b, 1c; 2a, 2b, 2c.
-
1a Explosion/fire
-
Initial Risk Assessment - Before the controls are in place. Refer to the risk assessment matrix
-
Control methods and level of control Describe the key/significant way to control the risk and then refer to the hierarchy of controls
-
Read & understand the relevant SDS
-
Level
-
Store as described, generally in a well-ventilated space not near an ignition source, keep separate from the driver
-
Level
-
Protect from extreme temperatures
-
Level
-
Residual risk assessment After all controls are in place. Refer to the risk assessment matrix.
-
1b Asphyxiation/intoxication
-
Initial Risk Assessment - Before the controls are in place. Refer to the risk assessment matrix
-
Control methods and level of control Describe the key/significant way to control the risk and then refer to the hierarchy of controls
-
Read & understand the relevant SDS
-
Level
-
Secure in a well-ventilated space
-
Level
-
If using in a confined space have emergency procedures in place and ensure a thorough task analysis is covered off.
-
Level
-
Residual risk assessment After all controls are in place. Refer to the risk assessment matrix.
Step 2
-
Use of Substances
Potential hazards and risks Describe the key hazards and risks for each step – there will normally be more than one per step. Number each hazard e.g 1a, 1b, 1c; 2a, 2b, 2c.
-
2a Burns
-
Initial Risk Assessment - Before the controls are in place. Refer to the risk assessment matrix
-
Control methods and level of control Describe the key/significant way to control the risk and then refer to the hierarchy of controls
-
Ensure staff are trained & competent in the use of this equipment
-
Level
-
Residual risk assessment After all controls are in place. Refer to the risk assessment matrix.
-
Correct PPE to be worn at all times
-
Level
-
2b Explosion/fire
-
Initial Risk Assessment - Before the controls are in place. Refer to the risk assessment matrix
-
Control methods and level of control Describe the key/significant way to control the risk and then refer to the hierarchy of controls
-
Store in a well-ventilated space and protected from extreme temperatures
-
Level
-
Use flashback arrestors on both the torch and cylinder end of the hose
-
Level
-
Use of correct PPE
-
Level
-
Residual risk assessment After all controls are in place. Refer to the risk assessment matrix.
Attendee Name
-
I have read and understood this Task Analysis. I agree to work to these terms and follow the process.
-
Name:
-
Signature
-
Date
-
Location of Review