Title Page
-
Site conducted
-
Site Name
-
Date
-
Simpro Job Number
-
Location
-
Fantail Employee Name
-
Fantail Employee Contact Number
-
Fantail Employee Signature
-
Site Contact Person:
-
Site Contact Number:
-
Fantail H & S Representative: Erik Potgieter
-
Fantail H & S Contact Number: 021 249 3563
-
Document Number
Working on roofs
PPE Required for ActivityTask
-
Hard Hat, Hi Visibility Vest, Safety Glasses, Safety boots, & gloves, harness
Roof Works
-
Sequence of Basic Steps: Describe each step in the activity – most will have 4-8 steps. Follow the flow of the product or process.
Step 1
-
undefined
Potential hazards and risks Describe the key hazards and risks for each step – there will normally be more than one per step. Number each hazard e.g 1a, 1b, 1c; 2a, 2b, 2c.
-
1a Fall from height
-
Initial Risk Assessment - Before the controls are in place. Refer to the risk assessment matrix
-
Control methods and level of control Describe the key/significant way to control the risk and then refer to the hierarchy of controls
-
Use a certified harness where there are no safe edge protection in place. Edge protection must be a minimum of 900mm above roof height.
-
Level
-
Maintain safe distance of a minimum of 1m from edge of roof line.
-
Level
-
Residual risk assessment After all controls are in place. Refer to the risk assessment matrix.
-
1b Falling Materials
-
Initial Risk Assessment - Before the controls are in place. Refer to the risk assessment matrix
-
Control methods and level of control Describe the key/significant way to control the risk and then refer to the hierarchy of controls
-
Isolate area below roof where work is being completed
-
Level
-
Isolate work area with no access permitted
-
Level
-
Residual risk assessment After all controls are in place. Refer to the risk assessment matrix.
-
1c Lacerations
-
Initial Risk Assessment - Before the controls are in place. Refer to the risk assessment matrix
-
Control methods and level of control Describe the key/significant way to control the risk and then refer to the hierarchy of controls
-
Slips, Trips and Falls
-
Wear correct PPE: Hard Hat, Hi Visibility Vest, Safety Glasses, Safety boots & gloves
-
Level
-
Ensure Situational Awareness
-
Level
-
Residual risk assessment After all controls are in place. Refer to the risk assessment matrix.
-
1d Electrical Hazards
-
Initial Risk Assessment - Before the controls are in place. Refer to the risk assessment matrix
-
Control methods and level of control Describe the key/significant way to control the risk and then refer to the hierarchy of controls
-
Wear correct PPE: Hard Hat, Hi Visibility Vest, Safety Glasses, Safety boots & gloves
-
Level
-
Test any electrical circuits and ensure they are isolated from the main switch board
-
Level
-
Residual risk assessment After all controls are in place. Refer to the risk assessment matrix.
Attendee Name
-
I have read and understood this Task Analysis. I agree to work to these terms and follow the process.
-
Name:
-
Signature
-
Date
-
Location of Review