Title Page
-
Contract Name and Number
-
Description of Works
-
Subcontractor
-
Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)
-
Construction Drawing Ref
-
Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)
-
Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)
Untitled Page
-
Check substrate is laid to specified falls and tolerances, is dry, frost free and not oil contaminated (Checked by Sub-Contractor)
-
Check substrate is laid to specified falls and tolerances, is dry, frost free and not oil contaminated (Checked by Ventry)
-
Check screed/concrete substrate has equivalent of a wood float finish (Checked by Sub-Contractor)
-
Check screed/concrete substrate has equivalent of a wood float finish (Checked by Ventry)
-
Check required chases are properly cut, immediately below associated DPCs (Checked by Sub-Contractor)
-
Check required chases are properly cut, immediately below associated DPCs (Checked by Ventry)
-
Check under-flashings and other metalwork are correctly installed (Checked by Sub-Contractor)
-
Check under-flashings and other metal work are correctly installed (Checked by Ventry)
-
Check outlets installed and fixed at correct height relative to substrate (Checked by Sub-Contractor)
-
Check outlets installed and fixed at correct height relative to substrate (Checked by Ventry)
-
Check vapour barrier/seperating membrane installed, if required (Checked by Sub-Contractor)
-
Check vapour barrier/seperating membrane installed, if required (Checked by Ventry)
-
Check asphalt thicknesses is as specified for horizontal work, vertical work and skirtings (Checked by Sub-Contractor)
-
Check asphalt thicknesses is as specified for horizontal work, vertical work and skirtings (Checked by Ventry)
-
Confirm information is available for all details, junctions, joints and solar protection (Checked by Sub-Contractor)
-
Confirm information is available for all details, junctions, joints and solar protection (Checked by Ventry)
-
Check risk assessment and method statement have been submitted and are approved (Checked by Sub-Contractor)
-
Check risk assessment and method statement have been submitted and are approved (Checked by Ventry)
-
Check that the specified grades of asphalt are being used (Checked by Sub-Contractor)
-
Check that the specified grades of asphalt are being used (Checked by Ventry)
-
Ensure that the temperate of the asphalt does not exceed 230 degrees when melting for use (Checked by Sub-Contractor)
-
Ensure that the temperate of the asphalt does not exceed 230 degrees when melting for use (Checked by Ventry)
-
Check timber gauges are used for horizontal work (Checked by Sub-Contractor)
-
Check timber gauges are used for horizontal work (Checked by Ventry)
-
Check each coat is laid as evenly as possible with minimum delay between coats (Checked by Sub-Contractor)
-
Check each coat is laid as evenly as possible with minimum delay between coats (Checked by Ventry)
-
Ensure full asphalt thickness is maintained for each coat on horizontal work (Checked by Sub-Contractor)
-
Ensure full asphalt thickness is maintained for each coat on horizontal work (Checked by Ventry)
-
Ensure any "day joints" are at least 75mm from "day joints" in preceding coats (Checked by Sub-Contractor)
-
Ensure any "day joints" are at least 75mm from "day joints" in preceding coats (Checked by Ventry)
-
Ensure moisture and contaminants are excluded from between layers (Checked by Sub-Contractor)
-
Ensure moisture and contaminants are excluded from between layers (Checked by Ventry)
-
Check asphalt upstands are keyed in if required, of correct thickness and tucked in (Checked by Sub-Contractor)
-
Check asphalt upstands are keyed in if required, of correct thickness and tucked in (Checked by Ventry)
-
Check fillets are provided between all horizontal and vertical work (Checked by Sub-Contractor)
-
Check fillets are provided between all horizontal and vertical work (Checked by Ventry)
-
Ensure that blows are pierced and made good while asphalt is still warm (Checked by Sub-Contractor)
-
Ensure that blows are pierced and made good while asphalt is still warm (Checked by Ventry)
-
Check asphalt continuity with any associated DPCs (Checked by Sub-Contractor)
-
Check asphalt continuity with any associated DPCs (Checked by Ventry)
-
Ensure solar reflective paint is applied to all exposed vertical surfaces and the specified solar protection is applied to exposed horizontal surfaces ASAP (Checked by Sub-Contractor)
-
Ensure solar reflective paint is applied to all exposed vertical surfaces and the specified solar protection is applied to exposed horizontal surfaces ASAP (Checked by Ventry)
-
Ensure work is protected against damage by following trades and spillages (Checked by Sub-Contractor)
-
Ensure work is protected against damage by following trades and spillages (Checked by Ventry)
Comments
-
Any Comments
Final Inspection - All Items Completed and Inspection Passed
-
Inspected By:
-
Inspected By:
-
Inspected By: