Title Page
-
Contract Name and Numbers
-
Description of Works
-
Subcontractor
-
Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)
-
Construction Drawing Ref
-
Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)
-
Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)
Untitled Page
-
Correct sub base type and level (Checked by Sub-Contractor)
-
Correct sub base type and level (Checked by Ventry)
-
Manhole and gulley frame line and level (Checked by Sub-Contractor)
-
Manhole and gulley frame line and level (Checked by Ventry)
-
Edge restraint complete (Checked by Sub-Contractor)
-
Edge restraint complete (Checked by Ventry)
-
Geotextile membrane complete (Checked by Sub-Contractor)
-
Geotextile membrane complete (Checked by Ventry)
-
Laying course type/thickness (Checked by Sub-Contractor)
-
Laying course type/thickness (Checked by Ventry)
-
Correct block/slab type and colour (Checked by Sub-Contractor)
-
Correct block/slab type and colour (Checked by Ventry)
-
Correct bond pattern (Checked by Sub-Contractor)
-
Correct bond pattern (Checked by Ventry)
-
Infills/cuts completed (Checked by Sub-Contractor)
-
Infills/cuts completed (Checked by Ventry)
-
Compaction adequate completed (Checked by Sub-Contractor)
-
Compaction adequate completed (Checked by Ventry)
-
Joints finished (Checked by Sub-Contractor)
-
Joints finished (Checked by Ventry)
-
Finished profile/tolerance (Checked by Sub-Contractor)
-
Finished profile/tolerance (Checked by Ventry)
Comments
-
Any Comments
Final Inspection - All Items Completed and Inspection Passed
-
Inspected By:
-
Inspected By:
-
Inspected By: