Title Page
-
Contract Name and Numbers
-
Description of Works
-
Subcontractor
-
Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)
-
Construction Drawing Ref
-
Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)
-
Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)
Untitled Page
-
Area handed over and ready (Checked by Sub-Contractor)
-
Area handed over and ready (Checked by Ventry)
-
Surface preparation - surface rubbed down, smooth and sealed as required (Checked by Sub-Contractor)
-
Surface preparation - surface rubbed down, smooth and sealed as required (Checked by Ventry)
-
Woodwork preparation - all areas to be made good, holes closed using pre-mixed fuller and then sanded smoothly. Application of stabilisers/knotting/fillers (Checked by Sub-Contractor)
-
Woodwork preparation - all areas to be made good, holes closed using pre-mixed fuller and then sanded smoothly. Application of stabilisers/knotting/fillers (Checked by Ventry)
-
Means of application (Checked by Sub-Contractor)
-
Means of application (Checked by Ventry)
-
Correct paint and method of application for specified location (Checked by Sub-Contractor)
-
Correct paint and method of application for specified location (Checked by Ventry)
-
Sanding between coats (Checked by Sub-Contractor)
-
Sanding between coats (Checked by Ventry)
-
Paint thickness, if applicable (Checked by Sub-Contractor)
-
Paint thickness, if applicable (Checked by Ventry)
-
Protection from damage (Checked by Sub-Contractor)
-
Protection from damage (Checked by Ventry)
-
Inspection of works/pre-snagging (Checked by Sub-Contractor)
-
Inspection of works/pre-snagging (Checked by Ventry)
Comments
-
Any Comments
Final Inspection - All Items Completed and Inspection Passed
-
Inspected By:
-
Inspected By:
-
Inspected By: