Title Page

  • Contract Name and Numbers

  • Description of Works

  • Subcontractor

  • Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)

  • Construction Drawing Ref

  • Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)

  • Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)

Untitled Page

1st Fix Installation

  • Moisture content at acceptable level (Checked by Sub-Contractor)

  • Moisture content at acceptable level (Checked by Ventry)

  • Timber primed before fixing (Checked by Sub-Contractor)

  • Timber primed before fixing (Checked by Ventry)

  • Cut ends treated, as specified (Checked by Sub-Contractor)

  • Cut ends treated, as specified (Checked by Ventry)

  • Components fabricated to specified dimensions and assembly (Checked by Sub-Contractor)

  • Components fabricated to specified dimensions and assembly (Checked by Ventry)

  • Installation line, levelled and plumb (Checked by Sub-Contractor)

  • Installation line, levelled and plumb (Checked by Ventry)

  • Interface of previous trades with joinery (M&E, noggins requirements etc) (Checked by Sub-Contractor)

  • Interface of previous trades with joinery (M&E, noggins requirements etc) (Checked by Ventry)

  • Correct fixings used (nail, screw, dowel, adhesive, gauge, number, material etc) (Checked by Sub-Contractor)

  • Correct fixings used (nail, screw, dowel, adhesive, gauge, number, material etc) (Checked by Ventry)

  • Fixed at correct centres (Checked by Sub-Contractor)

  • Fixed at correct centres (Checked by Ventry)

Hold Point Inspection

  • Items above to be checked before work continues with photographic evidence recorded

2nd Fix Installation

  • Fixings installed correctly and at correct spacings (Checked by Sub-Contractor)

  • Fixings installed correctly and at correct spacings (Checked by Ventry)

  • Type, colour and grain of pellets (Checked by Sub-Contractor)

  • Type, colour and grain of pellets (Checked by Ventry)

  • Mitres, ends and joints correctly formed (Checked by Sub-Contractor)

  • Mitres, ends and joints correctly formed (Checked by Ventry)

  • Intumescent strips/smoke seals fitted correctly, if required (Checked by Sub-Contractor)

  • Intumescent strips/smoke seals fitted correctly, if required (Checked by Ventry)

  • Acceptable quality of workmanship prior to following trades (Checked by Sub-Contractor)

  • Acceptable quality of workmanship prior to following trades (Checked by Ventry)

  • Adequate protection is used (Checked by Sub-Contractor)

  • Adequate protection is used (Checked by Ventry)

Comments

  • Any Comments

Final Inspection - All Items Completed and Inspection Passed

  • Inspected By:

  • Inspected By:

  • Inspected By:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.