Title Page
-
Contract Name and Numbers
-
Description of Works
-
Subcontractor
-
Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)
-
Construction Drawing Ref
-
Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)
-
Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)
Untitled Page
1st Fix Installation
-
Moisture content at acceptable level (Checked by Sub-Contractor)
-
Moisture content at acceptable level (Checked by Ventry)
-
Timber primed before fixing (Checked by Sub-Contractor)
-
Timber primed before fixing (Checked by Ventry)
-
Cut ends treated, as specified (Checked by Sub-Contractor)
-
Cut ends treated, as specified (Checked by Ventry)
-
Components fabricated to specified dimensions and assembly (Checked by Sub-Contractor)
-
Components fabricated to specified dimensions and assembly (Checked by Ventry)
-
Installation line, levelled and plumb (Checked by Sub-Contractor)
-
Installation line, levelled and plumb (Checked by Ventry)
-
Interface of previous trades with joinery (M&E, noggins requirements etc) (Checked by Sub-Contractor)
-
Interface of previous trades with joinery (M&E, noggins requirements etc) (Checked by Ventry)
-
Correct fixings used (nail, screw, dowel, adhesive, gauge, number, material etc) (Checked by Sub-Contractor)
-
Correct fixings used (nail, screw, dowel, adhesive, gauge, number, material etc) (Checked by Ventry)
-
Fixed at correct centres (Checked by Sub-Contractor)
-
Fixed at correct centres (Checked by Ventry)
Hold Point Inspection
-
Items above to be checked before work continues with photographic evidence recorded
2nd Fix Installation
-
Fixings installed correctly and at correct spacings (Checked by Sub-Contractor)
-
Fixings installed correctly and at correct spacings (Checked by Ventry)
-
Type, colour and grain of pellets (Checked by Sub-Contractor)
-
Type, colour and grain of pellets (Checked by Ventry)
-
Mitres, ends and joints correctly formed (Checked by Sub-Contractor)
-
Mitres, ends and joints correctly formed (Checked by Ventry)
-
Intumescent strips/smoke seals fitted correctly, if required (Checked by Sub-Contractor)
-
Intumescent strips/smoke seals fitted correctly, if required (Checked by Ventry)
-
Acceptable quality of workmanship prior to following trades (Checked by Sub-Contractor)
-
Acceptable quality of workmanship prior to following trades (Checked by Ventry)
-
Adequate protection is used (Checked by Sub-Contractor)
-
Adequate protection is used (Checked by Ventry)
Comments
-
Any Comments
Final Inspection - All Items Completed and Inspection Passed
-
Inspected By:
-
Inspected By:
-
Inspected By: