Title Page
-
Contract Name and Numbers
-
Description of Works
-
Subcontractor
-
Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)
-
Construction Drawing Ref
-
Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)
-
Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)
Untitled Page
-
Materials of type specified/approved (Checked by Sub-Contractor)
-
Materials of type specified/approved (Checked by Ventry)
-
Manufacturer's installation instructions obtained and method of installation will be in accordance with manufacturer's details (Checked by Sub-Contractor)
-
Manufacturer's installation instructions obtained and method of installation will be in accordance with manufacturer's details (Checked by Ventry)
-
Substrate surface prepared in accordance with manufacturer's details (Checked by Sub-Contractor)
-
Substrate surface prepared in accordance with manufacturer's details (Checked by Ventry)
-
Water levels established and any necessary precautions taken (Checked by Sub-Contractor)
-
Water levels established and any necessary precautions taken (Checked by Ventry)
-
Surfaces kept dry until relevant work completed (Checked by Sub-Contractor)
-
Surfaces kept dry until relevant work completed (Checked by Ventry)
-
Concrete/screed surfaces clean, smooth, and free from cavities and protrusions (Checked by Sub-Contractor)
-
Concrete/screed surfaced clean, smooth, and free from cavities and protrusions (Checked by Ventry)
-
Brickwork/blockwork surface as even as possible, and flush pointed or rendered (as specified) (Checked by Sub-Contractor)
-
Brickwork/blockwork surface as even as possible, and flush pointed or rendered (as specified) (Checked by Ventry)
-
Adequate ventilation maintained in confined spaces (Checked by Sub-Contractor)
-
Adequate ventilation maintained in confined spaces (Checked by Ventry)
-
Membrane applied in accordance with manufacturer's details etc. (Checked by Sub-Contractor)
-
Membrane applied in accordance with manufacturer's details etc. (Checked by Ventry)
-
Lap joints are pressed horizontal (Checked by Sub-Contractor)
-
Lap joints are pressed horizontal (Checked by Ventry)
-
Temperature is 5 deg C or above for laying membrane (Checked by Sub-Contractor)
-
Temperature is 5 deg C or above for laying membrane (Checked by Ventry)
-
Joints allowed to set/cure as recommended by manufacturer (Checked by Sub-Contractor)
-
Joints allowed to set/cure as recommended by manufacturer (Checked by Ventry)
-
Membrane to be protected from the follow on trades (Checked by Sub-Contractor)
-
Membrane to be protected from the follow on trades (Checked by Ventry)
-
Materials to be stored in dry conditions, temperature at 5 deg C or above and duly protected (Checked by Sub-Contractor)
-
Materials to be sorted in dry conditions, temperature at 5 deg C or above and duly protected (Checked by Ventry)
-
Rolls stacked on ends or as recommended by manufacturer (Checked by Sub-Contractor)
-
Rolls stacked on ends or as recommended by manufacturer (Checked by Ventry)
Comments
-
Any Comments
Final Inspection - All Items Completed and Inspection Passed
-
Inspected By:
-
Inspected By:
-
Inspected By: