Title Page

  • Contract Name and Numbers

  • Description of Works

  • Subcontractor

  • Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)

  • Construction Drawing Ref

  • Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)

  • Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)

Untitled Page

  • Risk assessments and method statement produced and approved (Checked by Sub-Contractor)

  • Risk assessments and method statement produced and approved (Checked by Ventry)

  • Does fill material ordered/delivered comply with specification? (Checked by Sub-Contractor)

  • Does fill material ordered/delivered comply with specification? (Checked by Ventry)

  • If waterproof membrane, if required, complies with specification, specification/drawings/manufacturer's recommendations? (Checked by Sub-Contractor)

  • If waterproof membrane, if required, complies with specification, specification/drawings/manufacturer's recommendations? (Checked by Ventry)

  • Has the area to be backfilled been cleared of formwork and loose materials? (Checked by Sub-Contractor)

  • Has the area to be backfilled been cleared of formwork and loose materials? (Checked by Ventry)

  • Does the structure need water testing? (Checked by Sub-Contractor)

  • Does the structure need water testing? (Checked by Ventry)

  • How is the area going to be dewatered during filling? (Checked by Sub-Contractor)

  • How is the area going to be dewatered during filling? (Checked by Ventry)

  • How and at what stage are excavation supports/shoring going to be removed? (Checked by Sub-Contractor)

  • How and at what stage are excavation supports/shoring going to be removed? (Checked by Ventry)

  • Does the structure need protecting during filling operations? (Checked by Sub-Contractor)

  • Does the structure need protecting during filling operations? (Checked by Ventry)

  • Have access routes been established and agreed? (Checked by Sub-Contractor)

  • Have access routes been established and agreed? (Checked by Ventry)

  • Have the tie holes been filled to the specification? (Checked by Sub-Contractor)

  • Have the tie holes been filled to the specification? (Checked by Ventry)

  • Has the compaction method been established, including thickness of layers, number of passes, etc? Is it being carried out correctly? (Checked by Sub-Contractor)

  • Has the compaction method been established, including thickness of layers, number of passes, etc? Is it being carried out correctly? (Checked by Ventry)

  • Thickness of layers and number of passes correct for items of plant use (Checked by Sub-Contractor)

  • Thickness of layers and number of passed correct for items of plant use (Checked by Ventry)

  • Compaction adequate (Checked by Sub-Contractor)

  • Compaction adequate (Checked by Ventry)

  • Service outlets to be marked above final backfill level (Checked by Sub-Contractor)

  • Service outlets to be marked above final backfill level (Checked by Ventry)

  • Samples of filling materials taken? (Checked by Sub-Contractor)

  • Samples of filling materials taken? (Checked by Ventry)

Comments

  • Any Comments

Final Inspection - All Items Completed and Inspection Passed

  • Inspected By:

  • Inspected By:

  • Inspected By:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.