Title Page
-
Contract Name and Numbers
-
Description of Works
-
Subcontractor
-
Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)
-
Construction Drawing Ref
-
Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)
-
Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)
Untitled Page
Structure Handover
-
Check structural opening sizes as per construction drawings (Checked by Sub-Contractor)
-
Check structural opening sizes as per construction drawings (Checked by Ventry)
Setting Out & Frame Installation
-
Gridlines and datums provided and agreed (Checked by Sub-Contractor)
-
Gridlines and datums provided and agreed (Checked by Ventry)
-
Correct brackets used (Checked by Sub-Contractor)
-
Correct brackets used (Checked by Ventry)
-
Frame installed to gridlines and datum (Checked by Sub-Contractor)
-
Frame installed to gridlines and datum (Checked by Ventry)
-
Fixings as detailed and to correct torque setting (Checked by Sub-Contractor)
-
Fixings as detailed and to correct torque setting (Checked by Ventry)
Hold Point Inspection
-
Items above to be checked before work continues with photographic evidence recorded
EPDM & Glazing
-
EPDM membrane installed and sealed (Checked by Sub-Contractor)
-
EPDM membrane installed and sealed (Checked by Ventry)
-
Rebate gaskets inserted and sealed (Checked by Sub-Contractor)
-
Rebate gaskets inserted and sealed (Checked by Ventry)
-
Correct glass identified and installed in correct orientation (Checked by Sub-Contractor)
-
Correct glass identified and installed in correct orientation (Checked by Ventry)
-
Glazing insert (vent/doors) installed (Checked by Sub-Contractor)
-
Glazing insert (vent/doors0 installed (Checked by Ventry)
-
Installation of perimeter pressings inspected (Checked by Sub-Contractor)
-
Installation of perimeter pressings inspected (Checked by Ventry)
-
Pressure plate and gaskets installed correctly (Checked by Sub-Contractor)
-
Pressure plate and gaskets installed correctly (Checked by Ventry)
-
Pressure plates and caps installed flush and correctly (Checked by Sub-Contractor)
-
Pressure plates and caps installed flush and correctly (Checked by Ventry)
-
Glazing insert gaskets inspected (Checked by Sub-Contractor)
-
Glazing insert gaskets inspected (Checked by Ventry)
-
Insert vent/door - operation inspected (Checked by Sub-Contractor)
-
Insert vent/door - operation inspected (Checked by Ventry)
Hold Point Inspection
-
Items above to be checked before work continues with photographic evidence recorded
2nd Fix Works
-
PPC inspected (Checked by Sub-Contractor)
-
PPC inspected (Checked by Ventry)
-
Silicone seals inspected (Checked by Sub-Contractor)
-
Silicone seals inspected (Checked by Ventry)
Comments
-
Any Comments
Final Inspection - All Items Completed and Inspection Passed
-
Inspected By:
-
Inspected By:
-
Inspected By: