  • Contract Name and Numbers

  • Description of Works

  • Subcontractor

  • Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)

  • Construction Drawing Ref

  • Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)

  • Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)

Untitled Page

  • Ensure Subcontractor is an approved applicator of the system (Checked by Sub-Contractor)

  • Ensure Subcontractor is an approved applicator of the system (Checked by Ventry)

  • Risk assessment and method statement agreed (Checked by Sub-Contractor)

  • Risk assessment and method statement agreed (Checked by Ventry)

  • Manufacturer's literature and instructions obtained (Checked by Sub-Contractor)

  • Manufacturer's literature and instructions obtained (Checked by Ventry)

  • Spray system compatible with steelwork primer (Checked by Sub-Contractor)

  • Spray system compatible with steelwork primer (Checked by Ventry)

  • Specified system requires temporary protection against rain/frost etc. (Checked by Sub-Contractor)

  • Specified system requires temporary protection against rain/frost etc. (Checked by Ventry)

  • Compliance with COSHH assessment (Checked by Sub-Contractor)

  • Compliance with COSHH assessment (Checked by Ventry)

  • Work area and adjacent areas suitably protected and with satisfactory access (Checked by Sub-Contractor)

  • Work area and adjacent areas suitably protected and with satisfactory access (Checked by Ventry)

  • Surfaces clean and dry and free loose scale, rust, oil, grease (Checked by Sub-Contractor)

  • Surfaces clean and dry and free loose scale, rust, oil, grease (Checked by Ventry)

  • Air temperature more than 4oC (or as specified by manufacturer) (Checked by Sub-Contractor)

  • Air temperature more than 4oC (or as specified by manufacturer) (Checked by Ventry)

  • Humidity in accordance with manufacturer's recommendations (Checked by Sub-Contractor)

  • Humidity in accordance with manufacturer's recommendations (Checked by Ventry)

  • Application of bonding coat, if required (Checked by Sub-Contractor)

  • Application of bonding coat, if required (Checked by Ventry)

  • Check coating thickness for each area and applicator (Checked by Sub-Contractor0

  • Check coating thickness for each area and applicator (Checked by Ventry)

  • Protected from weather as specified by manufacturer (Checked by Sub-Contractor)

  • Protected from weather as specified by manufacturer (Checked by Ventry)

Comments

  • Any Comments

Final Inspection - All Items Completed and Inspection Passed

  • Inspected By:

  • Inspected By:

  • Inspected By:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.