Title Page

  • Contract Name and Numbers

  • Description of Works

  • Subcontractor

  • Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)

  • Construction Drawing Ref

  • Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)

  • Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)

Untitled Page

  • Installation by a trained competent fire stopper (Checked by Sub-Contractor)

  • Installation by a trained competent fire stopper (Checked by Ventry)

  • Fire stop materials as specified (Checked by Sub-Contractor)

  • Fire stop materials as specified (Checked by Ventry)

  • Any noggins securely fixed (Checked by Sub-Contractor)

  • Any noggins securely fixed (Checked by Ventry)

  • Surface clean (Checked by Sub-Contractor)

  • Surface clean (Checked by Ventry)

  • Appropriate product for specific type of opening (as per agreed details) (Checked by Sub-Contractor)

  • Appropriate product for specific type of opening (as per agreed details) (Checked by Ventry)

  • Method of application as specified (caulking, spraying, adhesive strips etc.) (Checked by Sub-Contractor)

  • Method of application as specified (caulking, spraying, adhesive strips etc.) (Checked by Ventry)

  • Fire stops continuous with no gaps (Checked by Sub-Contractor)

  • Fire stops continuous with no gaps (Checked by Ventry)

  • All fire stop products securely fixed using specified/approved fixings/adhesive (Checked by Sub-Contractor)

  • All fire stop products securely fixed using specified/approved fixings/adhesive (Checked by Ventry)

  • Walk through inspections to be conducted by BC as installation proceeds to avoid concealment by other trades (Checked by Sub-Contractor)

  • Walk through inspections to be conducted by BC as installation proceeds to avoid concealment by other trades (Checked by Ventry)

  • Inspections and testing if required (Checked by Sub-Contractor)

  • Inspections and testing if required (Checked by Ventry)

  • Building Control final inspection (Checked by Sub-Contractor)

  • Building Control final inspection (Checked by Ventry)

  • Inspection by Independent Certifier (Checked by Sub-Contractor)

  • Inspection by Independent Certifier (Checked by Ventry)

Comments

  • Any Comments

Final Inspection - All Items Completed and Inspection Passed

  • Inspected By:

  • Inspected By:

  • Inspected By:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.