Title Page
-
Contract Name and Numbers
-
Description of Works
-
Subcontractor
-
Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)
-
Construction Drawing Ref
-
Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)
-
Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)
Untitled Page
-
Setting out (Checked by Sub-Contractor)
-
Setting out (Checked by Ventry)
-
Excavations dry and clean (Checked by Sub-Contractor)
-
Excavations dry and clean (Checked by Ventry)
-
Dimensions as specified/depth checked (Checked by Sub-Contractor)
-
Dimensions as specified/depth checked (Checked by Ventry)
-
Drop manhole box (Checked by Sub-Contractor)
-
Drop manhole box (Checked by Ventry)
-
Lifting operations H&S check (Checked by Sub-Contractor)
-
Lifting operations H&S check (Checked by Ventry)
-
Pipe bedding complies with specification, being accurately placed and compacted as required (Checked by Sub-Contractor)
-
Pipe bedding complies with specification, being accurately placed and compacted as required (Checked by Ventry)
-
Dry concrete dropped (Checked by Sub-Contractor)
-
Dry concrete dropped (Checked by Ventry)
-
Channel formed as required (Checked by Sub-Contractor)
-
Channel formed as required (Checked by Ventry)
-
Rings dropped and sealed as per requirements (Checked by Sub-Contractor)
-
Rings dropped and sealed as per requirements (Checked by Ventry)
-
Biscuit dropped (Checked by Sub-Contractor)
-
Biscuit dropped (Checked by Ventry)
-
Shutter and concrete as specified (Checked by Sub-Contractor)
-
Shutter and concrete as specified (Checked by Ventry)
-
Manhole box removed (Checked by Sub-Contractor)
-
Manhole box removed (Checked by Ventry)
-
Water testing of manhole (Checked by Sub-Contractor)
-
Water testing of manhole (Checked by Ventry)
-
Blocks layed and manhole cover installed as specified (Checked by Sub-Contractor)
-
Blocks layed and manhole cover installed as specified (Checked by Ventry)
-
Pumping station installed (Checked by Sub-Contractor)
-
Pumping station installed (Checked by Ventry)
-
Manholes protected against blockage by debris (Checked by Sub-Contractor)
-
Manholes protected against blockage by debris (Checked by Ventry)
-
Backfill as specified (Checked by Sub-Contractor)
-
Backfill as specified (Checked by Ventry)
-
Final water testing of drainage (Checked by Sub-Contractor)
-
Final water testing of drainage (Checked by Ventry)
-
Final inspections and CCTV survey (Checked by Sub-Contractor)
-
Final inspections and CCTV survey (Checked by Ventry)
Comments
-
Any Comments
Final Inspection - All Items Completed and Inspection Passed
-
Inspected By:
-
Inspected By:
-
Inspected By: