Title Page

  • Contract Name and Numbers

  • Description of Works

  • Subcontractor

  • Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)

  • Construction Drawing Ref

  • Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)

  • Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)

Untitled Page

External Sheathing Board

  • Correct type and thickness of board (Checked by Sub-Contractor)

  • Correct type and thickness of board (Checked by Ventry)

  • Correct position and layout of boards (Checked by Sub-Contractor)

  • Correct position and layout of boards (Checked by Ventry)

  • Correct type and depth of fixings (Checked by Sub-Contractor)

  • Correct type and depth of fixings (Checked by Ventry)

  • Correct no and centre of fixings (Checked by Sub-Contractor)

  • Correct no and centre of fixings (Checked by Ventry)

  • Correct sealing of boards (Checked by Sub-Contractor)

  • Correct sealing of boards (Checked by Ventry)

  • Correct sealing of al penetrations (Checked by Sub-Contractor)

  • Correct sealing of all penetrations (Checked by Ventry)

  • Boards are free from damage (Checked by Sub-Contractor)

  • Boards are free from damage (Checked by Ventry)

  • Allowance for any movement if required (Checked by Sub-Contractor)

  • Allowance for any movement if required (Checked by Ventry)

Hold Point Inspection

  • Items above to be checked before work continues with photographic evidence recorded

Breather Membrane

  • Correct type of breather membrane (Checked by Sub-Contractor)

  • Correct type of breather membrane (Checked by Ventry)

  • Lapped correctly (Checked by Sub-Contractor)

  • Lapped correctly (Checked by Ventry)

  • Sealed correctly (Checked by Sub-Contractor)

  • Sealed correctly (Checked by Ventry)

  • Correct orientation (Checked by Sub-Contractor)

  • Correct orientation (Checked by Ventry)

  • Free from damage (Checked by Sub-Contractor)

  • Free from damage (Checked by Ventry)

Hold Point Inspection

  • Items above to be checked before work continues with photographic evidence recorded

Insulation and Wall Tie Channel

  • Correct type and thickness of installation (Checked by Sub-Contractor)

  • Correct type and thickness of installation (Checked by Ventry)

  • Correct orientation, staggered insulation (Checked by Sub-Contractor)

  • Correct orientation, staggered insulation (Checked by Ventry)

  • Insulation free from damage (Checked by Sub-Contractor)

  • Insulation free from damage (Checked by Ventry)

  • Insulation boards close butted at joints (Checked by Sub-Contractor)

  • Insulation boards close butted at joints (Checked by Ventry)

  • Correct type of wall tie channel (Checked by Sub-Contractor)

  • Correct type of wall tie channel (Checked by Ventry)

  • Correct position and centres of wall tie channels (Checked by Sub-Contractor)

  • Correct position and centres of wall tie channels (Checked by Ventry)

  • Correct type of wall tie channel fixings (Checked by Sub-Contractor)

  • Correct type of wall tie channel fixings (Checked by Ventry)

  • Correct no and centres of wall tie fixings (Checked by Sub-Contractor)

  • Correct no and centres of wall tie fixings (Checked by Ventry)

  • Wall tie channels fixed either end (Checked by Sub-Contractor)

  • Wall tie channels fixed either end (Checked by Ventry)

  • Wall tie channel fixed into metal stud at correct length (Checked by Sub-Contractor)

  • Wall tie channel fixed into metal stud at correct length (Checked by Ventry)

Hold Point Inspection

  • Items above to be checked before work continues with photographic evidence recorded

Fire Cavity Barriers (Vertical & Horizontal)

  • Correct type (Checked by Sub-Contractor)

  • Correct type (Checked by Ventry)

  • Correct position (Checked by Sub-Contractor)

  • Correct position (Checked by Ventry)

  • Correct type of fixing, no and centres (Checked by Sub-Contractor)

  • Correct type of fixing, no and centres (Checked by Ventry)

  • Fire barrier continuous no gaps (Checked by Sub-Contractor)

  • Fire barrier continuous no gaps (Checked by Ventry)

  • Free from damage (Checked by Sub-Contractor)

  • Free from damage (Checked by Ventry)

  • Cavity barrier compressed between inner and outer leaf (Checked by Sub-Contractor)

  • Cavity barrier compressed between inner and outer lead (Checked by Ventry)

  • Cavity barrier cut into insulation (Checked by Sub-Contractor)

  • Cavity barrier cut into insulation (Checked by Ventry)

  • Horizontal DPC positioned above any horizontal cavity barrier (Checked by Sub-Contractor)

  • Horizontal DPC positioned above any horizontal cavity barrier (Checked by Ventry)

  • Vertical DPC should be positioned between vertical cavity barrier and masonry outer leaf (Checked by Sub-Contractor)

  • Vertical DPC should be positioned between vertical cavity barrier and masonry outer leaf (Checked by Ventry)

Hold Point Inspection

  • Items above to be checked before work continues with photographic evidence recorded

Masonry Support System

  • Correct type of masonry support system (Checked by Sub-Contractor)

  • Correct type of masonry support system (Checked by Ventry)

  • Correct position, line and level (Checked by Sub-Contractor)

  • Correct position, line and level (Checked by Ventry)

  • Correct type of shims positioned over fixing bolts (Checked by Sub-Contractor)

  • Correct type of shims positioned over fixing bolts (Checked by Ventry)

  • Shimming does not exceed maximum specified (Checked by Sub-Contractor)

  • Shimming does not exceed maximum specified (Checked by Ventry)

  • Correct type, length & no of fixing bolts (Checked by Sub-Contractor)

  • Correct type, length & no of fixing bolts (Checked by Ventry)

  • Correct no and type of fixing bolts (Checked by Sub-Contractor)

  • Correct no and type of fixing bolts (Checked by Ventry)

  • Torque tested to manufacturers recommendations (Checked by Sub-Contractor)

  • Torque tested to manufacturers recommendations (Checked by Ventry)

  • Cavity ties positioned at correct centres above and below support angle (Checked by Sub-Contractor)

  • Cavity ties positioned at correct centres above and below support angle (Checked by Ventry)

  • Free from damage (Checked by Sub-Contractor)

  • Free from damage (Checked by Ventry)

Hold Point Inspection

  • Items above to be checked before work continues with photographic evidence recorded

DPC Cavity Trays

  • DPC tray fully bedded (Checked by Sub-Contractor)

  • DPC tray fully bedded (Checked by Ventry)

  • DPC tray is installed at correct height (Checked by Sub-Contractor)

  • DPC tray is installed at correct height (Checked by Ventry)

  • DPC tray stepped down or falling across the cavity (Checked by Sub-Contractor)

  • DPC tray stepped down or falling across the cavity (Checked by Ventry)

  • DPC tray extended beyond lintels and stop ended for weephole drainage (Checked by Sub-Contractor)

  • DPC tray extended beyond lintels and stop ended for weephole drainage (Checked by Ventry)

  • DPC tray has correct overlap and sealed at joints (Checked by Sub-Contractor)

  • DPC tray has correct overlap and sealed at joints (Checked by Ventry)

  • DPC tray lapped and sealed at changes of direction and at face of steel columns (Checked by Sub-Contractor)

  • DPC tray lapped and sealed at changes of direction and at face of steel columns (Checked by Ventry)

  • Coring holes and hessian provided above drainage holes (Checked by Sub-Contractor)

  • Coring holes and hessian provided above drainage holes (Checked by Ventry)

  • DPC tray is free from damage (Checked by Sub-Contractor)

  • DPC tray is free from damage (Checked by Ventry)

Hold Point Inspection

  • Items above to be checked before work continues with photographic evidence recorded

Brickwork

  • Correct type of bricks/mixed from packs (Checked by Sub-Contractor)

  • Correct type of bricks/mixed from packs (Checked by Ventry)

  • Correct type and strength of mortar (Checked by Sub-Contractor)

  • Correct type and strength of mortar (Checked by Ventry)

  • Correct type and length of channel tie (Checked by Sub-Contractor)

  • Correct type and length of channel tie (Checked by Ventry)

  • Channel tie correct drip position (Checked by Sub-Contractor)

  • Channel tie correct drip position (Checked by Ventry)

  • Channel tie centres correct (Checked by Sub-Contractor)

  • Channel tie centres correct (Checked by Ventry)

  • Correct tie embedment to outer leaf (Checked by Sub-Contractor)

  • Correct tie embedment to outer leaf (Checked by Ventry)

  • Mortar bed joints formed and solid (Checked by Sub-Contractor)

  • Mortar bed joints formed and solid (Checked by Ventry)

  • Set out correctly, level and plumb (Checked by Sub-Contractor)

  • Set our correctly, level and plumb (Checked by Ventry)

  • Cavities clean and ties free from mortar (Checked by Sub-Contractor)

  • Cavities clean and ties free from mortar (Checked by Ventry)

  • Minimum cavity clearance provided (Checked by Sub-Contractor)

  • Minimum cavity clearance provided (Checked by Ventry)

  • Correct type of lintel (Checked by Sub-Contractor)

  • Correct type of lintel (Checked by Ventry)

  • Lintel installed at correct height (Checked by Sub-Contractor)

  • Lintel installed at correct height (Checked by Ventry)

  • Lintel provided with correct and full bearing (Checked by Sub-Contractor)

  • Lintel provided with correct and full bearing (Checked by Ventry)

  • Bed joint reinforcement correct type and width above and below openings (Checked by Sub-Contractor)

  • Bed joint reinforcement correct type and width above and below openings (Checked by Ventry)

  • Vertical DPC's installed correctly (Checked by Sub-Contractor)

  • Vertical DPC's installed correctly (Checked by Ventry)

  • Movement joints formed plumb, constant width (Checked by Sub-Contractor)

  • Movement joints formed plumb, constant width (Checked by Ventry)

  • Pointing uniform and constant in appearance (Checked by Sub-Contractor)

  • Pointing uniform and constant in appearance (Checked by Ventry)

  • Brickwork appearance (Checked by Sub-Contractor)

  • Brickwork appearance (Checked by Ventry)

  • Weepholes installed above cavity tray/lintels at correct centres (Checked by Sub-Contractor)

  • Weepholes installed above cavity tray/lintels at correct centres (Checked by Ventry)

  • Brickwork adequately protected (Checked by Sub-Contractor)

  • Brickwork adequately protected (Checked by Ventry)

Comments

  • Any Comments

Final Inspection - All Items Completed and Inspection Passed

  • Inspected By:

  • Inspected By:

  • Inspected By:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.