Title Page

  • Contract Name and Numbers

  • Description of Works

  • Subcontractor

  • Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)

  • Construction Drawing Ref

  • Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)

  • Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)

Untitled Page

  • Is the method statement approved by the consultant? (Checked by Sub-Contractor)

  • Is the method statement approved by the consultant? (Checked by Ventry)

  • Reinforcement as per PT drawings? (Checked by Sub-Contractor)

  • Reinforcement as per PT drawings? (Checked by Ventry)

  • Cover as per PT drawings? (Checked by Sub-Contractor)

  • Cover as per PT drawings? (Checked by Ventry)

  • Laying of ducts and tendons as per PT drawings? (Checked by Sub-Contractor)

  • Laying of ducts and tendons as per PT drawings? (Checked by Ventry)

  • Alignment as per PT drawings? (Checked by Sub-Contractor)

  • Alignment as per PT drawings? (Checked by Ventry)

  • Profile as per PT drawings? (Checked by Sub-Contractor)

  • Profile as per PT drawings? (Checked by Ventry)

  • Brustling and spalling bars as per PT drawings? (Checked by Sub-Contractor)

  • Brustling and spalling bars as per PT drawings? (Checked by Ventry)

  • Number of strands and tendons as per PT drawings? (Checked by Sub-Contractor)

  • Number of strands and tendons as per PT drawings? (Checked by Ventry)

  • Back propping to previous slab as per specifications if required (Checked by Sub-Contractor)

  • Back propping to previous slab as per specifications if required (Checked by Ventry)

  • Extra reinforcement for construction joints as per PT General Drawings (Checked by Sub-Contractor)

  • Extra reinforcement for construction joints as per PT General Drawings (Checked by Ventry)

  • Pockets in slab at live end anchorage as per PT drawings? (Checked by Sub-Contractor)

  • Pockets in slab at live end anchorage as per PT drawings? (Checked by Ventry)

  • Severn days after concreting check the concrete cube strength (Checked by Sub-Contractor)

  • Severn days after concreting check the concrete cube strength (Checked by Ventry)

  • Stress the tendons as per specification after achieving specified concrete strength (Checked by Sub-Contractor)

  • Stress the tendons as per specification after achieving specified concrete strength (Checked by Ventry)

  • Check the tendon stressing report and elongation report as per design (Checked by Sub-Contractor)

  • Check the tendon stressing report and elongation report as per design (Checked by Ventry)

  • Do the pocket patching of anchorage end of tendons? (Checked by Sub-Contractor)

  • Do the pocket patching of anchorage end of tendons? (Checked by Ventry)

  • Grout the ducts as per specification if stress/elongation reports are okay (Checked by Sub-Contractor)

  • Grout the ducts as per specification if stress/elongation reports are okay (Checked by Ventry)

  • Remove the back propping and de-shutter the beam and slab (Checked by Sub-Contractor)

  • Remove the back propping and de-shutter the beam and slab (Checked by Ventry)

  • Mark with colour on the soffit of slab of alignment of tendon (Checked by Sub-Contractor)

  • Mark with colour on the soffit of slab of alignment of tendon (Checked by Ventry)

Comments

  • Any Comments

Final Inspection - All Items Completed and Inspection Passed

  • Inspected By:

  • Inspected By:

  • Inspected By:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.