Title Page
-
Contract Name and Numbers
-
Description of Works
-
Subcontractor
-
Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)
-
Construction Drawing Ref
-
Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)
-
Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)
Untitled Page
-
Is the method statement approved by the consultant? (Checked by Sub-Contractor)
-
Is the method statement approved by the consultant? (Checked by Ventry)
-
Reinforcement as per PT drawings? (Checked by Sub-Contractor)
-
Reinforcement as per PT drawings? (Checked by Ventry)
-
Cover as per PT drawings? (Checked by Sub-Contractor)
-
Cover as per PT drawings? (Checked by Ventry)
-
Laying of ducts and tendons as per PT drawings? (Checked by Sub-Contractor)
-
Laying of ducts and tendons as per PT drawings? (Checked by Ventry)
-
Alignment as per PT drawings? (Checked by Sub-Contractor)
-
Alignment as per PT drawings? (Checked by Ventry)
-
Profile as per PT drawings? (Checked by Sub-Contractor)
-
Profile as per PT drawings? (Checked by Ventry)
-
Brustling and spalling bars as per PT drawings? (Checked by Sub-Contractor)
-
Brustling and spalling bars as per PT drawings? (Checked by Ventry)
-
Number of strands and tendons as per PT drawings? (Checked by Sub-Contractor)
-
Number of strands and tendons as per PT drawings? (Checked by Ventry)
-
Back propping to previous slab as per specifications if required (Checked by Sub-Contractor)
-
Back propping to previous slab as per specifications if required (Checked by Ventry)
-
Extra reinforcement for construction joints as per PT General Drawings (Checked by Sub-Contractor)
-
Extra reinforcement for construction joints as per PT General Drawings (Checked by Ventry)
-
Pockets in slab at live end anchorage as per PT drawings? (Checked by Sub-Contractor)
-
Pockets in slab at live end anchorage as per PT drawings? (Checked by Ventry)
-
Severn days after concreting check the concrete cube strength (Checked by Sub-Contractor)
-
Severn days after concreting check the concrete cube strength (Checked by Ventry)
-
Stress the tendons as per specification after achieving specified concrete strength (Checked by Sub-Contractor)
-
Stress the tendons as per specification after achieving specified concrete strength (Checked by Ventry)
-
Check the tendon stressing report and elongation report as per design (Checked by Sub-Contractor)
-
Check the tendon stressing report and elongation report as per design (Checked by Ventry)
-
Do the pocket patching of anchorage end of tendons? (Checked by Sub-Contractor)
-
Do the pocket patching of anchorage end of tendons? (Checked by Ventry)
-
Grout the ducts as per specification if stress/elongation reports are okay (Checked by Sub-Contractor)
-
Grout the ducts as per specification if stress/elongation reports are okay (Checked by Ventry)
-
Remove the back propping and de-shutter the beam and slab (Checked by Sub-Contractor)
-
Remove the back propping and de-shutter the beam and slab (Checked by Ventry)
-
Mark with colour on the soffit of slab of alignment of tendon (Checked by Sub-Contractor)
-
Mark with colour on the soffit of slab of alignment of tendon (Checked by Ventry)
Comments
-
Any Comments
Final Inspection - All Items Completed and Inspection Passed
-
Inspected By:
-
Inspected By:
-
Inspected By: