Title Page

  • Contract Name and Numbers

  • Description of Works

  • Subcontractor

  • Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)

  • Construction Drawing Ref

  • Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)

  • Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)

Untitled Page

1st Fix Installation

  • Under floor services installation completed (Checked by Sub-Contractor)

  • Under floor services installation completed (Checked by Ventry)

  • Gridline's/datums provided, setting out (Checked by Sub-Contractor)

  • Gridline's/datums provided, setting out (Checked by Ventry)

  • Pedestals fixed (Checked by Sub-Contractor)

  • Pedestals fixed (Checked by Ventry)

  • Pendulum tests on supports carried out of specified (Checked by Sub-Contractor)

  • Pendulum tests on supports carried out of specified (Checked by Ventry)

Hold Point Inspection

  • Items above to be checked before work continues with photographic evidence recorded

2nd Fix Installation

  • Levels of finished floor with tolerance (Checked by Sub-Contractor)

  • Levels of finished floor with tolerance (Checked by Ventry)

  • No unevenness absence of lips and protrusions, no rocking tiles (Checked by Sub-Contractor)

  • No unevenness absence of lips and protrusions, no rocking tiles (Checked by Ventry)

  • Apertures correctly positioned (Checked by Sub-Contractor)

  • Apertures correctly positioned (Checked by Ventry)

  • Ancillary bracing provided if required (Checked by Sub-Contractor)

  • Ancillary bracing provided if required (Checked by Ventry)

  • Required cavity barriers, perimeter closures correct (Checked by Sub-Contractor)

  • Required cavity barriers, perimeter closures correct (Checked by Ventry)

  • Sub floor services correctly bridged (Checked by Sub-Contractor)

  • Sub floor services correctly bridged (Checked by Ventry)

  • Expansion joints, edge gaps (Checked by Sub-Contractor)

  • Expansion joints, edge gaps (Checked by Ventry)

Hold Point Inspection

  • Items above to be checked before work continues with photographic evidence recorded

Post Installation

  • Finished floor height achieved (Checked by Sub-Contractor)

  • Finished floor height achieved (Checked by Ventry)

  • Check for stability and load bearing (Checked by Sub-Contractor)

  • Check for stability and load bearing (Checked by Ventry)

  • Earth bonding completed when required (Checked by Sub-Contractor)

  • Earth bonding completed when required (Checked by Ventry)

  • Air leakage test (if required) (Checked by Sub-Contractor)

  • Air leakage test (if required) (Checked by Ventry)

  • Protection of completed works, if required (Checked by Sub-Contractor)

  • Protection of completed works, if required (Checked by Ventry)

Comments

  • Any Comments

Final Inspection - All Items Completed and Inspection Passed

  • Inspected By:

  • Inspected By:

  • Inspected By:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.