Title Page

  • Contract Name and Numbers

  • Description of Works

  • Subcontractor

  • Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)

  • Construction Drawing Ref

  • Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)

  • Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)

Untitled Page

  • Check risk assessment and method statement have been submitted and approved (Checked by Sub-Contractor)

  • Check risk assessment and method statement have been submitted and approved (Checked by Ventry)

  • Obtain manufacturer's recommendations/instructions (Checked by Sub-Contractor)

  • Obtain manufacturer's recommendations/instructions (Checked by Ventry)

  • Check all co-ordination with other trades has been finalised and agreed (Checked by Sub-Contractor)

  • Check all co-ordination with other trades has been finalised and agreed (Checked by Ventry)

  • Check services are at correct level, position, tested and lagged (Checked by Sub-Contractor)

  • Check services are at correct level, position, tested and lagged (Checked by Ventry)

  • Fixing sample test completed and approved (Checked by Sub-Contractor)

  • Fixing sample test completed and approved (Checked by Ventry)

  • Check compliance with the specification of: Tile module size, Grid type, Hanger system, Ceiling fittings, Surface finishes, Thermal insulation requirements (Checked by Sub-Contractor)

  • Check compliance with the specification of: Tile module size, Grid type, Hanger system, Ceiling fittings, Surface finishes, Thermal insulation requirements (Checked by Ventry)

  • Check any fire stopping and making good within ceiling void is complete (Checked by Sub-Contractor)

  • Check any fire stopping and making good within ceiling void is complete (Checked by Ventry)

  • Check delivered materials are correct to specification and stored and handled correctly (Checked by Sub-Contractor)

  • Check delivered materials are correct to specification and stored and handled correctly (Checked by Ventry)

  • Check setting out requirements are finalised (Checked by Sub-Contractor)

  • Check setting out requirements are finalised (Checked by Ventry)

  • Check environmental conditions are correct before tiling (Checked by Sub-Contractor)

  • Check environmental conditions are correct before tiling (Checked by Ventry)

  • Check: Wall plastering high enough, Perimeter battens correctly fixed, Ceiling zone services completed at correct level and approved, Fire/sound barriers completed support hangers can be installed at correct centres (Checked by Sub-Contractor)

  • Check: Wall plastering high enough, Perimeter battens correctly fixed, Ceiling zone services completed at correct level and approved, Fire/sound barriers completed support hangers can be installed at correct centres (Checked by Ventry)

  • Check access for commissioning and maintenance is adequate (Checked by Sub-Contractor)

  • Check access for commissioning and maintenance is adequate (Checked by Ventry)

  • Check provision of access is satisfactory (Checked by Sub-Contractor)

  • Check provision of access is satisfactory (Checked by Ventry)

  • Check pattresses are provided for M&E fixings, if necessary (Checked by Sub-Contractor)

  • Check pattresses are provided for M&E fixings, if necessary (Checked by Ventry)

  • Confirm ceiling support system can withstand the imposed loads (Checked by Sub-Contractor)

  • Confirm ceiling support system can withstand the imposed loads (Checked by Ventry)

  • Confirm the proposed hangar fixings and their method of use will be adequate (Checked by Sub-Contractor)

  • Confirm the proposed hangar fixings and their method of use will be adequate (Checked by Ventry)

  • Check cover up authorisations, where appropriate (Checked by Sub-Contractor)

  • Check cover up authorisations, where appropriate (Checked by Ventry)

  • Check compliance with method statement (Checked by Sub-Contractor)

  • Check compliance with method statement (Checked by Ventry)

  • Check all required hangers are provided and securely fixed (Checked by Sub-Contractor0

  • Check all required hangers are provided and securely fixed (Checked by Ventry)

  • Check setting out is correct to ceiling plan (Checked by Sub-Contractor)

  • Check setting out is correct to ceiling plan (Checked by Ventry)

  • Check ceiling is fixed to correct line and level (Checked by Sub-Contractor)

  • Check ceiling is fixed to correct line and level (Checked by Ventry)

  • Check direction of tiles is correct (Checked by Sub-Contractor)

  • Check direction of tiles is correct (Checked by Ventry)

  • Check that cutting/trimming is carried out in agreed manner (Checked by Sub-Contractor)

  • Check that cutting/trimming is carried out in agreed manner (Checked by Ventry)

  • Check access panels/tiles are provided at specified locations (Checked by Sub-Contractor)

  • Check access panels/tiles are provided at specified locations (Checked by Ventry)

  • Check insulation is fixed correctly (Checked by Sub-Contractor)

  • Check insulation is fixed correctly (Checked by Ventry)

  • Check fire blankets securely fixed and line up with fire dampers in ductwork (Checked by Sub-Contractor)

  • Check fire blankets securely fixed and line up with fire dampers in ductwork (Checked by Ventry)

  • Visual inspection of ceiling support post M&E second fix work prior to handover (Checked by Sub-Contractor)

  • Visual inspection of ceiling support post M&E second fix work prior to handover (Checked by Ventry)

  • Check overall stability of grid system (Checked by Sub-Contractor)

  • Check overall stability of grid system (Checked by Ventry)

  • Check finished ceiling is free of damage (Checked by Sub-Contractor)

  • Check finished ceiling is free of damage (Checked by Ventry)

  • Ensure agreed protection is provided (Checked by Sub-Contractor)

  • Ensure agreed protection is provided (Checked by Ventry)

  • Check area left clean and tidy (Checked by Sub-Contractor)

  • Check area left clean and tidy (Checked by Ventry)

  • Check that dissimilar materials (e.g. steel/aluminum) are seperated in approved manner (Checked by Sub-Contractor)

  • Check that dissimilar materials (e.g. steel/aluminum) are seperated in approved manner (Checked by Ventry)

  • Check provision for expansion (Checked by Sub-Contractor)

  • Check provision for expansion (Checked by Ventry)

  • Check that erection is carried out in the correct sequence (Checked by Sub-Contractor)

  • Check that erection is carried out in the correct sequence (Checked by Ventry)

  • Check no shot fixings have been used without the approval of the architect/engineer (Checked by Sub-Contractor)

  • Check no shot fixings have been used without the approval of the architect/engineer (Checked by Ventry)

  • Visual inspection of the ceiling support post building/commissioning work prior to handover (Checked by Sub-Contractor)

  • Visual inspection of the ceiling support post building/commissioning work prior to handover (Checked by Ventry)

Comments

  • Any Comments

Final Inspection - All Items Completed and Inspection Passed

  • Inspected By:

  • Inspected By:

  • Inspected By:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.