Information

  • Audit 750-FRM-0024 rev 1 March 28th, 2011 Quality Audit - Raw Materials

  • Client / Site

  • Conducted on

  • Audited by

Administration

  • Contact Name

  • Number of employees

  • Number of work quarters

  • Building age. If extension, please specify dates

  • Is there a union? If yes, which is the agreement convention due date?

150-HRS HUMAN RESOURCES

  • 1- Is there a training program for new employees?

  • 2- Is there a training program specific to certain tasks (For example: maintenance, cleaning, quality control)? See some employee's forms.

  • 3- Do all employees have been trained in accordance with good manufacturing practices?

  • 4- Are subcontractors also trained in accordance with good manufacturing practices?

  • 5-Is there a continue training program for all employees? Specify the themes.

450-MMS GOODS / PURCHASES MANAGEMENT

  • 1-Is there an approval system for suppliers?

  • 2- Is there an approval process for new ingredients? (Allergen, Kosher, Technical sheet)

  • 3- Are certificates of analysis required from suppliers?

550-PMS ENGINEERING AND MAINTENANCE

  • 1- Are the outside of the building and the field well maintained? ?

  • 2- Is the inside of the building well maintained and designed to ensure food safety of products?

  • 3- Are the equipments well designed and positioned properly (to facilitate cleaning and maintenance and thus reduce the risk of contamination)?

  • 4- Are maintenance chemicals food grade at production areas?

  • 5-Does the company have a management program for maintenance with a risk of foreign material?

  • 6- Do you have a preventive maintenance program?

  • 7- Are the water, steam and compressed air systems appropriate to prevent product and environment contamination?

650-PPS PRODUCTION PROCESS

  • 1- Does the company have a traceability system (describe the process)?

  • 2- Does the company make measurements and analysis during production?

  • 3- Does the company make controls at product packaging (sealing, identification)?

  • 4- Does the company have a weight control system?

  • 5- Is there a procedure in place for the management of rework?

  • 6- Is there a system in place for the management of containers, utensils and tools (identification, color coding)?

750-QMS QUALITY MANAGEMENT

  • 1- Does the company have an accreditation to a quality standard? If yes, please specify (attach a copy of the certificate).

  • 2- Is the company audited by external agencies or third party? If yes, please specify.

  • 3- Does the company perform internal facility audits (minimum once per month)?

  • 4- Is the effectiveness of the quality system reviewed regularly?

  • 5- Is there a documentary managment system?

  • 6- Is there any HACCP plan in place for each product family? If yes, specify the product families and the CCP's.

  • 7- Are the CCP control responsible persons adequately trained and are able to make good decisions in case of critical limit deviation ?

  • 8- Audit at least 3 control registers for each CCP.

  • 9- Are the protection mechanisms against foreign bodies appropriate (magnets, sieves, filters, metal detectors, X-Ray detectors, optical sorters)?

  • 10- Are the protection mechanisms frequently verified. (See registers).

  • 11- Are the flour sifter tailings checked frequently?

  • 12- Does the company conduct an investigation when a foreign body is found inside the facility (See registers).

  • 13- Is there a calibrations program for equipments (lab and production)?

  • 14- Does the company conduct microbiological and chemical analysis of raw materials and/or finished products?

  • 15- Is there a specification management system of finished products?

  • 16- Is there a product recall procedure?

  • 17- Does the company conduct a mock recall at least once a year? (See the last simulation and describe the results)

  • 18- Does the company have a complaint management system?

  • 19- Is there a mechanism for identifying non-compliant products? If yes, describe the mechanism.

  • 20- Is there a master cleaning schedule (including frequency and methodology for all building components and equipments)?

  • 21- Is the cleaning program effective? Please see documentation for at least 3 items).

  • 22- Are the cleaning products approved for food?

  • 23- Does the company conducts pre-operational inspection of the surfaces in contact with food?

  • 24- Is there a program to validate the effectiveness of cleaning?

  • 25- Does the company have a pest control program?

  • 26- Does the company uses a contractor for this service? If yes, what is the name of the company?

  • 27- Is the pest control program adequate?

  • 28- Is there any evidence of contamination by insects, rodents or other?

  • 29- Is there a documented procedures for handling glass, brittle or hard plastic?

  • 30- Are all the lighting system adequately protected to prevent risk for the products?

  • 31- Is there a zone to isolate the nonconforming or quarantined products?

  • 32- Is there an allergen management program in place?

820-WMS LOGISTICS / WAREHOUSE - RECEIVING

  • 1- Does the company ensure stock rotation according to the FIFO (first in, first out) or other principle?

  • 2- Does the company has a location management system?

  • 3- Are the raw materials and the packaging goods stored, handled and properly identified to insure their integrity and their traceability?

  • 4- Are there any designated areas for raw materials versus finished products?

  • 5- Is the warehouse temperature controlled? If yes, what are the normal or programmed temperatures?

  • 6- Is the warehouse humidity controlled? If yes, what are the normal or programmed humidity levels?

  • 7- Is the racking system at a minimum distance of 18 inches from the walls?

  • 8- Is there a visual inspection of the trucks before loading? If yes, is it documented?

  • 9- Is there a visual inspection of the products before loading? If yes, is it documented?

  • 10- Is the security system adequate to fight against bioterrorism? Note FDA number

Appendix 1 - Allergens

ALLERGENS IN THE PLANT

  • PEANUTS AND DERIVED PRODUCTS (example: PEANUT OIL)

  • NUTS AND DERIVED PRODUCTS

  • SESAME SEEDS

  • DAIRY PRODUCTS - SPECIFY: MILK, LACTOSE, CASEIN, WHEY

  • EGGS

  • FISH

  • <br>MOLLUSCS

  • SOYA AND DERIVED PRODUCTS (example: SOY PROTEINS, LECITHIN, OIL)

  • WHEAT / GLUTEN (eg SEASONING, FLAVOR, OATS, BARLEY, TRITICAL, ETC.)

  • SULFITES AND DERIVED PRODUCTS

  • MUSTRAD

  • OTHER (SPECIFY)

  • Comments

Appendix 2 - COMMENTS

  • Indicate the unsatisfactory elements to be improved

Appendix 3 - STATUS

SUPPLIER

  • Quality VP validation

  • Select date

  • IN CAS OF CONDITION - VALIDATION

  • Auditor Signature

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.